COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
401173755
04/11/2017
Operator shall pressure test pipelines (flowlines from wellheads to separators to tanks; pipelines from onsite separators to offsite storage tanks, and any temporary surface lines used for hydraulic stimulation and/or flowback operations) in accordance with Rule 1101.e.(1) prior to putting into initial service any temporary surface or permanent buried pipelines and following any reconfiguration of the pipeline network, and tested annually, unless agreed to by both parties that the flowlines can be managed under an approved COGCC variance.
OGLAForm: (02A)
401173755
04/11/2017
A closed loop system must be implemented during drilling (as indicated on the Form 2 and Form 2A). The moisture content of all drill cuttings managed onsite shall be kept as low as practicable to prevent accumulation of liquids greater than de minimis amounts. All cuttings generated during drilling with salt-based mud (SBM) must be segregated from water/bentonite based mud-(WBM-) generated drill cuttings and placed separately on the well pad. All SBM-generated drill cuttings must be kept in tanks/containers, or placed on a lined/bermed portion of the well pad; prior to disposition. The operator has indicated that ‘Cuttings Disposal’ will be “OFFSITE” and that the ‘Cuttings Disposal Method’ will be “COMMERCIAL DISPOSAL” (as shown in the ‘DRILLING WASTE MANAGEMENT PROGRAM SECTION’ of the Form 2A). All liners associated with salt-based drilling mud and SBM-generated drill cuttings must be disposed of offsite per CDPHE rules and regulations. Any changes to drill cuttings management and disposal at this location will require submittal (via a Form 4 Sundry Notice) and approval of a Waste Management Plan detailing the changes (specifying cuttings characterization methods, cuttings management, amendment, and onsite disposal location[s]). Flowback and stimulation fluids must be sent to tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline or storage vessel located on the well pad; or into tanker trucks for offsite disposal. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area constructed to be sufficiently impervious to contain any spilled or released material. Due to public accessibility to the nearby recreational areas within the Forest Service lands, potential odors associated with the completions process and/or with long term production operations must be controlled/mitigated.
OGLAForm: (02A)
401173755
04/11/2017
Operator must ensure secondary containment for any volume of fluids contained at the well site during drilling and completion operations (as shown on the Proposed BMPs attachment); including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., best management practices [BMPs] associated with fluid containment/control as well as stormwater management for the control of run-on and run-off) sufficiently protective of nearby surface water. Any berm constructed at the well pad location will be stabilized, inspected at regular intervals as required by CDPHE (at least every 14 days and after precipitation events), and maintained in good condition. The design/build of any perimeter berm shall be sized, constructed, and compacted sufficiently to contain fluids during drilling operations, as well as all fluids contained in temporary frac tanks during completion operations. Based on the recent onsite (11-10-17) conducted by COGCC, Forest Service, and the operator, additional stormwater controls will be required for the existing well pad area of this oil and gas location. The access road will be maintained as to not allow sediment to migrate from the access road to nearby surface water or any drainages leading to surface water. Strategically apply fugitive dust control measures, including encouraging established speed limits on private and Forest Service roads, to reduce fugitive dust and coating of vegetation and deposition in water sources. Berms or other containment devices shall be constructed to be sufficiently impervious (corrugated steel with poly liner or equivalent protection) to contain any spilled or released material around permanent produced water storage tanks.
OGLAForm: (02A)
401173755
04/11/2017
In addition to the notifications required by Rule 316C. COGCC Form 42. FIELD OPERATIONS NOTICE (a. Notice of Intent to Conduct Hydraulic Fracturing Treatment; b. Notice of Spud; and c. Notice of Construction or Major Change); operator shall notify the COGCC 48 hours prior to rig mobilization and pipeline testing (flowlines from wellheads to separators to tanks; and/or any temporary surface lines used for hydraulic stimulation and/or flowback operations) using the Form 42 (as described in Rule 316C.m. Notice of Completion of Form 2/2A Permit Conditions). The appropriate COGCC individuals will automatically be email notified.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
WildlifeForm: (02A )
401173755
4/28/2017
Covered in the San Juan Basin Colorado Wildlife Mitigatin Plan (WMP) dated march 2011.
Storm Water/Erosion ControlForm: (02A )
401173755
4/28/2017
Covered in the Field Wide Storm Water managment Plan. Site specific SWMPs have been developed for this location including sediment control logs and rock rundowns. See attached Construction and Reclamation SWMP drawings for details.
Interim ReclamationForm: (02A )
401173755
4/28/2017
All of the disturbed areas not used for routine operations will be reclaimed. This will include re-contouring slopes to 3:1 or greater and seeding/mulching. The seed will be drilled or broadcasted where machinery can not access. Straw mulch will be spread and crimped over the seeded areas to retain moisture and limit erosion. Weeds will be inspected and treated annually, when necessary, by a certified weed control contractor.