Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION324754SPICER PAD
FULCRUM ENERGY OPERATING LLC
10805
AC
9/16/2025
UNNAMED
85251
JACKSON  057
SWSW 32 7N80W 6
324754View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400392131
06/09/2013
BASELINE GROUNDWATER/SURFACE WATER TESTING COA: Operator shall comply with Rule 609. STATEWIDE GROUNDWATER BASELINE SAMPLING AND MONITORING.
OGLAForm: (02A)
400392131
06/09/2013
SITE SPECIFIC COAs: Notify the COGCC 48 hours prior to start of pad construction, rig mobilization, spud, and start of hydraulic stimulation operations using Form 42 (the appropriate COGCC individuals will automatically be email notified, including the LGD for hydraulic stimulation operations). Reserve pit, or any other pit used to contain/hold fluids, if constructed, must be lined or a closed loop system must be implemented during drilling. Operator must implement best management practices to contain any unintentional release of fluids, including any fluids conveyed via temporary surface pipelines or buried permanent pipelines. Operator must ensure secondary containment for any volume of fluids contained at well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., best management practices (BMPs) associated with stormwater management) sufficiently protective of nearby surface water. Any berm constructed at the well pad location will be stabilized, inspected at regular intervals (at least every 14 days), and maintained in good condition. The moisture content of any cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, if the drill cuttings are to be left onsite, they must also meet the applicable standards of table 910-1. If the well is to be hydraulically stimulated, then flowback and stimulation fluids must be sent to tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline, storage vessel, or lined pit (only if an amended Form 2A has been submitted/approved and a Form 15 Earthen Pit Permitted has been submitted/approved) located on the well pad; or into tanker trucks for offsite disposal. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area with additional downgradient perimeter berming. The area where flowback fluids will be stored/reused must be constructed to be sufficiently impervious to contain any spilled or released material. Berms or other containment devices shall be constructed to be sufficiently impervious (preferably corrugated steel with poly liner) to contain any spilled or released material around crude oil, condensate, and produced water storage tanks.
EnvironmentalForm: (04)
402136401
08/07/2019
Alll fluid should be handled as E&P waste.
EnvironmentalForm: (04)
402136401
08/07/2019
Temporary frac tank should have secondary containment per rule 604.c.(3)B.
EnvironmentalForm: (04)
402136401
08/07/2019
The Tank should be removed no later than 10/21/2019.
EnvironmentalForm: (04)
402136401
08/07/2019
The bin should be stored in a way that it is compliant with all stormwater rules and permits.
EnvironmentalForm: (04)
402146770
08/16/2019
The bin should be stored in a way that it is compliant with all stormwater rules and permits.
EnvironmentalForm: (04)
402146770
08/16/2019
The Tank should be removed no later than 9/27/2019.
EnvironmentalForm: (04)
402146770
08/16/2019
Bin should have secondary containment per rule 604.c.(3)B.
EnvironmentalForm: (04)
402146770
08/16/2019
All material should be handled as E&P waste.
EnvironmentalForm: (04)
402146770
08/16/2019
Only E&P waste from remediation at Location ID 324754 shall be placed in the shale bin.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400558091
5/6/2014
See BLM SUPO for Spicer Froniter 3-32H