| DOW | Form: (02A) 400046395 05/18/2010 | 1.There will be no human disturbance or construction activity within 0.5 mile of the active bald eagle nest from November 15 to July 31. The July 31 date may be advanced if monitoring shows the chicks have left the nest before this date.
2. There will be no major planned work with workover rigs, such as refracs, recompletions, or reworks, between November 1 and July 31. Minor workover or swabbing to improve production that could be completed within a 2-day time frame would be allowed.
3. There will be no open pits on the location after drilling and completion operations are completed. After this time, fluids will be transported by pipeline to a tank battery located approximately 3050 ft WSW of the proposed wellhead. Construction of the flowline will conform to the timeframe stated in #1. If a closed loop system is not used, the reserve pit will be sucked dry of fluids immediately following drilling and completion activities, and between drilling and completion activities; or pits with residual fluid will be netted or screened until reclamation is completed.
4. Before drilling, prairie dog holes within 150 ft of the well site should be destroyed during the period August 1 through March 1 to prevent nesting by burrowing owls.
|
| Agency | Form: (02A) 400046395 06/03/2010 | CLOSED LOOP OR LINED PIT MUST BE USED AT THIS LOCATION |