| Site Specific | Form: (02A ) 400321199 10/30/2012 | In conjunction with the Town of Hudson, Anadarko will develop a site specific traffic management plan that will address the following: (1) expected traffic and timing of such traffic, (2) how traffic in busy or sensitive intersections will be managed and mitigated, and (3) what truck traffic restrictions will be put in place, if any |
| Planning | Form: (02A ) 400321199 10/30/2012 | Anadarko will take appropriate steps to adequately protect valve boxes and manholes located along any of our access roads |
| Drilling/Completion Operations | Form: (02A ) 400321199 10/30/2012 | Anadarko will perform a road impact study for all roads belonging to the Town of Hudson prior to operations and then a second road impact study subsequent to drilling and completion operations. Anadarko will pay for all required fixes to ensure any damaged roads are brought back to their condition prior to our operations |
| Planning | Form: (02A ) 400321199 10/30/2012 | Anadarko will provide the Town of Hudson an emergency response plan prior to commencing operations |