Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION318150ADAM FARM
2-4
KERR MCGEE OIL & GAS ONSHORE LP
47120
AC
10/2/2024
WATTENBERG
90750
FIRESTONE/WELD  123
SWNE 4 2N68W 6
318150View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02A )
2032533
4/20/2009
<style type="text/css"> p {margin:0px 0px 0px 2px;} ul {margin-top:2px;margin-bottom:2px;} ol {margin-top:2px;margin-bottom:2px;} H1 {font-family:Arial;font-size:28px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} H2 {font-family:Arial;font-size:24px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} H3 {font-family:Arial;font-size:18px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} .Normal {font-family:Arial;font-size:14px;text-align:Left;vertical-align:Middle;color:#000000;} .TableDefault {border-collapse:collapse;border:1px solid #000000;} .TableDefault th {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;} .TableDefault td {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;} </style> <p><span class="Normal">Rule 303.d.3.C,D, J</span></p>
AgencyForm: (02A )
2032533
7/2/2009
The operator has agreed to use a closed-loop drilling system for this well.
AdministratorForm: (02A )
2032533
7/17/2009
<style type="text/css"> p {margin:0px 0px 0px 2px;} ul {margin-top:2px;margin-bottom:2px;} ol {margin-top:2px;margin-bottom:2px;} H1 {font-family:Arial;font-size:28px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} H2 {font-family:Arial;font-size:24px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} H3 {font-family:Arial;font-size:18px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} .Normal {font-family:Arial;font-size:14px;text-align:Left;vertical-align:Middle;color:#000000;} .TableDefault {border-collapse:collapse;border:1px solid #000000;} .TableDefault th {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;} .TableDefault td {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;} </style> <p><span class="Normal">The operator has agreed to use a closed-loop drilling system.</span></p>
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PROPOSED BMPsForm: (07 )
0
1/23/2012
APR 2 8 1009 Anadarko Petroleum Corporation COGCC Stormwater Management Program 3M P5 Anadarko has prepared two stormwater management plans to ensure our compliance with COGCC and CDPHE stormwater management requirements. The CDPHE stormwater management plan covers construction activities while the COGCC plan covers post construction activities. In order to be in compliance with the stormwater regulations, it is necessary for sediment containment systems to be utilized at our sites. Sediment containment systems consist of best management practices (BMP's) such as silt fencing, straw bales, erosion control blankets, continuous berms etc. A combination of BMP's may be used at any given site. Anadarko strives to use BMP's that are least intrusive, yet provide the required sediment control and surface water protection. The sediment controls used are determined at the time of construction. Copies of both stormwater management plans are kept at our field office in Evans and our region office in Denver along with a copy at the Colorado Oil and Gas Conservation Commission and are available for inspection.