COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EnvironmentalForm: (04)
402619477
03/29/2021
If locations are in a sensitive area because of its proximity to surface water operator must ensure 110 percent secondary containment for any volume of fluids contained at the water handling facility site during natural gas development activities and operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., best management practices (bmps) associated with stormwater management) sufficiently protective of nearby surface water. Any berm constructed at the well pad location will be stabilized, inspected at regular intervals (at least every 4 days), and maintained in good condition.
EnvironmentalForm: (04)
402619477
03/29/2021
Termination of activities: both TEP and XTO shall notify the COGCC via sundry immediately upon termination of activities.
EnvironmentalForm: (04)
402619477
03/29/2021
Produced water or flowback water or other exploration and production waste shall not be temporarily stored in modular large volume storage tanks (MLVSTs). Produced water or flowback water shall be temporarily stored in frac tanks.
EnvironmentalForm: (04)
402619477
03/29/2021
Within 6-months of completion of the Water Share, all temporary above ground conveyance lines, pumps, valves, and any other associated equipment and materials shall be removed and areas reclaimed. Operator shall submit a F27 for the decommisioning of all Oil and Gas Facilities related with the wate share agreement.
EnvironmentalForm: (04)
402619477
03/29/2021
When lines are not in service greater than 24 hours, lines will be pigged dry and will not be left with fluid when lines are unattended.
EnvironmentalForm: (04)
402619477
03/29/2021
XTO Energy - PC 8-1 Pad Temporary Booster Pump Operator shall adhere to all 600 Series Rules for tank setbacks and signs.
EnvironmentalForm: (04)
402619477
03/29/2021
Operator shall adhere to all 1100 Series Flowline Regulations as it pertains to the various water supply lines used in the water share.
 