Drilling/Completion Operations | Form: (02A ) 400111246 1/3/2011 | To address construction during drilling and all other operations associated with Oil and Gas development throughout Southern Yuma County, Colorado area StormWater Management Plans(SWMP) are in place and in compliance with the Colorado Department of Health and Environment (CDPHE) under Permit # COR-039920.
Best Management Practices (BMP’s) will be reviewed and maintained prior to, during and after construction of drilling site, laying of flowlines, installation of surface equipment and reclamation of site. Each location’s BMP’s will vary according to terrain and phase of construction and will be implemented in accordance to SWMP.
Regular location inspections will be performed and any BMP’s not effectively working will be documented and resolved in a timely manner.
Spill Prevention, Control and Countermeasures will be implemented. Should any spills occur they will be cleaned up immediately and effectively to minimize any integration with storm water runoff. General good housekeeping practices will be performed to keep spills at a minimum
|