COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400787932
09/03/2015
Operartor shall submit Reference Area Pictures taken during the growing season within 12 months of the submittal of this Form 2A.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02A )
400373022
2/28/2013
Bonanza Creek Energy Best Management Practices for Installation of Cement Water Vaults at locations Associated with Shallow Groundwater The following procedure describes construction practices for setting a partially buried pre-cast cement water vault on locations characterized as containing shallow depth to groundwater. 1) The excavation will first be lined with 4” of clay or other low permeability soil. 2) A 30 mil liner will be installed on top of the low permeability soil. The 30 mil liner will be a contiguous liner which will underlay the entire tank battery. 3) The tank battery / water vault liner will be keyed into a galvanized steel containment ring installed surrounding the tank battery. 4) Sand bedding will be installed to protect the synthetic liner prior to placing equipment in the containment area.
ConstructionForm: (04 )
400753878
12/24/2014
Bonanza Creek Energy Operating Company acknowledges and will comply with the “COGCC Policy On the Use of Modular Large Volume Tanks in Colorado” dated June 13, 2014.
ConstructionForm: (02A )
400787932
11/24/2015
The following procedure describes BCEI standard construction practices for setting a partially buried pre-cast cement water vault and new tank battery construction. 1) The excavation will first be lined with 4” of clay or other low permeability soil. 2) A 30 mil liner will be installed on top of the low permeability soil. The 30 mil liner will be a contiguous liner which will underlay the entire tank battery. 3) The tank battery / water vault liner will be keyed into a galvanized steel containment ring installed surrounding the tank battery. 4) Sand bedding will be installed to protect the synthetic liner prior to placing equipment in the containment area.
ConstructionForm: (02A )
400787932
11/24/2015
Bonanza Creek Energy Operating Company acknowledges and will comply with the “COGCC Policy On the Use of Modular Large Volume Tanks in Colorado” dated June 13, 2014.