Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION310085PHILLIPS
24-35
PDC ENERGY INC
69175
AC
5/1/2024
WATTENBERG
90750
GREELEY/WELD  123
NESW 24 5N67W 6
310085View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02A)
1904290
07/20/2009
<style type="text/css"> p {margin:0px 0px 0px 2px;} ul {margin-top:2px;margin-bottom:2px;} ol {margin-top:2px;margin-bottom:2px;} H1 {font-family:Arial;font-size:28px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} H2 {font-family:Arial;font-size:24px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} H3 {font-family:Arial;font-size:18px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} .Normal {font-family:Arial;font-size:14px;text-align:Left;vertical-align:Middle;color:#000000;} .TableDefault {border-collapse:collapse;border:1px solid #000000;} .TableDefault th {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;} .TableDefault td {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;} </style> <p><span class="Normal">1) PROVIDE 24 HOUR NOTICE OF MIRU TO ED BINKLEY AT 970-506-9834 OR E-MAIL AT </span><span class="Normal">ED.BINKLEY@STATE.CO.US 2) COMPLY WITH RULE 317.I AND PROVIDE CEMENT COVERAGE FROM </span><span class="Normal">TD TO A MINIMUM OF 200' ABOVE NIOBRARA. VERIFY COVERAGE WITH CEMENT BOND LOG.</span></p>
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PROPOSED BMPsForm: (07 )
0
1/23/2012
Petro - Canada Resources (USA) Inc (PCR) has in place Stormwater Management Plans to ensure compliance with the Colorado Oil & Gas Conservation Commission (COGCC) and the Colorado Department of Public Health and Environment (CDPHE) requirements The CDPHE Stormwater Management Plan covers construction activities and the COGCC plan addresses post - construction activities PCR utilizes sediment containment systems, which includes silt fencing, straw bales, erosion control blankets, berms, etc Erosion and sediment control BMP's are dependent upon site slopes, drainage patterns and quantities, and other site - specific conditions BMP's will be applied on a site specific basis and not all BMP's will be used at each construction site PCR strives to use BMP's that minimize surface disturbance and adverse environmental effects, such as erosion and sediment production. A copy of PCR's Stormwater Management Plan is kept in our field offices in LaSalle and Grover and our regional office in Denver