LOCATION309903Schmunk EF Pad
31-361HN
PDC ENERGY INC
69175
AC
1/1/2024
EATON
19350
WELD  123
NWNE 31 7N65W 6
309903View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400524225
12/24/2013
Operator will comply with all applicable mitigation measures as listed in COGCC Rule 604.c.
OGLAForm: (04)
400618822
06/09/2014
Operator shall comply with the COGCC Policy on the Use of Modular Large Volume Tanks in Colorado dated May 29, 2014.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (02A )
400524225
2/13/2014
General housekeeping will consist of neat and orderly storage of materials and fluids. Wastes will be temporarily stored in sealed containers and regularly collected and disposed of at offsite, suitable facilities. If spills occur prompt cleanup is required to minimize any commingling of waste materials with storm water runoff. Routine maintenance will be limited to fueling and lubrication of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or leaks. Any waste product from maintenance will be containerized and transported offsite for disposal or recycling. There will be no major equipment overhauls conducted onsite. Equipment will be transported offsite for major overhauls. Cleanup will consist of patrolling the roadways, access areas, and other work areas to pick up trash, scrap debris, other discarded materials, and any contaminated soil. These materials will be disposed of properly and promptly.
Storm Water/Erosion ControlForm: (02A )
400524225
2/13/2014
Storm Water Management Plans (SWMP) are in place to address construction, drilling and operations associated with Oil and Gas development throughout the state of Colorado in accordance with Colorado Department of Public Health and Environment (CDPHE). BMP’s will be constructed around the perimeter of the site prior to, or at the beginning of construction. BMP’s used will vary according to the location, and will remain in place until the pad reaches final reclamation.
Material Handling and Spill PreventionForm: (02A )
400524225
2/13/2014
Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spills associated with Oil and Gas operations throughout the state of Colorado in accordance with CFR 112. In accordance with COGCC Rule 1002.f.(2)A. & B., shall provide a designated storage area for dry bulk chemicals and miscellaneous fluids. The storage area shall be covered to prevent contact of precipitation with chemicals, shall be elevated above storm- or standing water, and shall provide sufficient containment to prevent release of spilled fluids or chemicals from impacting soil, surface water or groundwater and will prevent the co-mingling of spilled fluids or chemicals with other E & P Waste.
Noise mitigationForm: (02A )
400524225
2/13/2014
Noise levels will be maintained at levels not to exceed COGCC specifications currently in existence, measured at a point 350’ from the noise source, or as defined by current COGCC regulations. Where possible, drilling rig engine exhaust will be vented away from occupied buildings. Light sources will likewise be directed downwards, and away from occupied structures where possible. No special noise mitigation efforts should be required at this site. Once the drilling and completion rigs leave the site, there will be no permanently installed lighting on site.