Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION309552APACHE CANYON
09-02
OGRIS OPERATING LLC
10758
AC
12/1/2021
PURGATOIRE RIVER
70830
LAS ANIMAS  071
NWNE 9 34S67W 6
309552View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A )
400121165
1/14/2011
The site specific BMPS provided by XTO Energy for Erosion control and storm water management should be implemented immediately after pad construction.
OGLAForm: (02A )
400121165
1/14/2011
Due to the SARUCHE-ROMBO-ROCK OUTCROP COMPLEX the following will apply: Location is in a sensitive area because of potential for adverse impacts to ground water/surface water; therefore all pits will be lined.
OGLAForm: (02A )
400121165
1/14/2011
Operator must implement site-specific best management practices in accordance with good engineering practices, including, but not limited to, construction of a berm or diversion dike, site grading, or other comparable measures, sufficient to prevent a release of drilling, completion, produced fluids, or chemical products from migrating off of the oil and gas location.
OGLAForm: (02A )
400121165
1/14/2011
No portion of any pit that will be used to hold liquids shall be constructed on fill material, unless the pit and fill slope are designed and certified by a professional engineer, subject to review and approval by the director prior to construction of the pit. The construction and lining of the pit shall be supervised by a professional engineer or their agent.
 
COGIS - Best Management Practice Results
No records to display.