OGLA | Form: (02A ) 400118678 1/17/2011 | Operator must implement site-specific best management practices in accordance with good engineering practices, including, but not limited to, construction of a berm or diversion dike, site grading, or other comparable measures, sufficient to prevent a release of drilling, completion, produced fluids, or chemical products from migrating off of the oil and gas location. |
OGLA | Form: (02A ) 400118678 1/17/2011 | No portion of any pit that will be used to hold liquids shall be constructed on fill material, unless the pit and fill slope are designed and certified by a professional engineer, subject to review and approval by the director prior to construction of the pit. The construction and lining of the pit shall be supervised by a professional engineer or their agent. |
OGLA | Form: (02A ) 400118678 1/17/2011 | Due to the Saruche-Rombo Complex soil type the following will apply: Location is in a sensitive area because of potential for adverse impacts to ground water/surface water; therefore all pits will be lined. |