| OGLA | Form: (02A) 400253493 02/29/2012 | Operator must implement site-specific best management practices in accordance with good engineering practices, including, but not limited to, construction of a perimeter berm or diversion dike, site grading, or other comparable measures, sufficient to ensure adequate secondary containment for any volume of fluids contained at well site during drilling and completion operations. |
| OGLA | Form: (02A) 400253493 02/29/2012 | Location is on steep slopes; therefore the cut and fill slopes should be constructed in such a manner to manage site drainage and slope stability. The slopes should be stabilized immediately after the location has been constructed. |