| UIC | Form: (31) 401078613 10/10/2016 | 1. Injection is not authorized until approval of Subsequent Forms 31 and 33.
2. Prior to performing operations, Operator is required to contact COGCC to discuss Step Rate Test or Injectivity Test criteria for Maximum Surface Injection Pressure determination. Prior approval of Form 4 is required for step rate and injectivity tests.
3. Prior to performing operations approval of Form 4 is required for acid and fracturing jobs. (New as of 4/13/2016).
4. Operator must provide all tops of formations encountered from surface to TD on the Form 5 when submitted.
|
| UIC | Form: (31) 401078613 10/10/2016 | Operator is required to file a Form 5A-Completed Interval Report:
a.Notifying COGCC of the initial injection date within thirty (30) days of the commencement of injection, and
b.Updating COGCC on the status of the formations used for injection.
|
| UIC | Form: (31) 401078613 10/10/2016 | One year after the initial injection date Operator is required to file a Form 4-Sundry Notice with injected water analysis. Minimum analyses are TDS, major cations, and major anions. Data must also be submitted to COGCC Database in Electronic Data Deliverable (EDD) format. After the initial 1-year analysis, the analysis shall be repeated at five (5) year intervals. |
| UIC | Form: (31) 401078613 10/10/2016 | If operator wishes to inject at a rate higher than 10,000 barrels/day or increase the Maximum Injection Volume permitted here they must contact COGCC and make an application via Form 4-Sundry Notice. |
| UIC | Form: (31) 401078613 10/10/2016 | Operator is required to perform additional Mechanical Integrity Tests ("MITs") at five (5) year intervals from the first test date reported here. If the downhole well configuration is changed at any time an MIT must be performed before the well is returned to injection. |
| UIC | Form: (31) 401212642 02/17/2017 | Within thirty (30) days of the commencement of injection operator is required to file a Form 5A-Completed Interval Report:
a.Notifying COGCC of the initial injection date, and
b.Updating COGCC on the status of the formations used for injection.
|
| UIC | Form: (31) 401212642 02/17/2017 | One year after the initial injection date Operator is required to file a Form 4-Sundry Notice with analysis of injected water. Minimum analyses are TDS, major cations, and major anions. Data must also be submitted to COGCC Database in Electronic Data Deliverable (EDD) format. After the initial 1-year analysis, the analysis shall be repeated at five (5) year intervals. |
| UIC | Form: (31) 401212642 02/17/2017 | If operator wishes to inject at a rate higher than 10,000 barrels/day or increase the Maximum Injection Volume permitted here they must contact COGCC and make an application via Form 4-Sundry Notice. |
| UIC | Form: (31) 401212642 02/17/2017 | Operator is required to perform additional Mechanical Integrity Tests ("MITs") at five (5) year intervals from the first test date reported here. If the downhole well configuration is changed at any time a new MIT must be passed before the well is returned to injection. All injection well MITs must be witnessed by COGCC. |
| UIC | Form: (31) 401212642 02/17/2017 | If Sandridge wishes to inject more than 10,000 bbls/day they will be required to monitor for seismic activity in the Judy 1-30 area. If the Judy 1-30 area is not already monitored for seismic activity then Sandridge will be required to install a seismometer at a location to be determined by Sandridge and COGCC. Sandridge will be responsible for maintenance of the seismometer. Data gathered by the seismometer will be made available to one or more third parties (such as the USGS, CU-Boulder, CSM, or CSU) for analysis. |