| UIC | Form: (31) 401067334 12/22/2016 | One year after the initial injection date Operator is required to file a Form 4-Sundry Notice with injected water analysis. Minimum analyses are TDS, major cations, and major anions. Data must also be submitted to COGCC Database in Electronic Data Deliverable (EDD) format. After the initial 1-year analysis, the analysis shall be repeated at five (5) year intervals. |
| UIC | Form: (31) 401067334 12/22/2016 | Operator is required to perform additional Mechanical Integrity Tests ("MITs") at five (5) year intervals from the first test date reported here. If the downhole well configuration is changed at any time an MIT must be performed before the well is returned to injection. |
| UIC | Form: (31) 401067334 12/22/2016 | Injection is not authorized until approval of Subsequent Forms 31 and 33. |
| UIC | Form: (31) 401176289 03/06/2017 | Within thirty (30) days of the commencement of injection operator is required to file a Form 5A-Completed Interval Report:
a.Notifying COGCC of the initial injection date, and
b.Updating COGCC on the status of the formations used for injection.
|
| UIC | Form: (31) 401176289 03/06/2017 | One year after the initial injection date Operator is required to file a Form 4-Sundry Notice with analysis of injected water. Minimum analyses are TDS, major cations, and major anions. Data must also be submitted to COGCC Database in Electronic Data Deliverable (EDD) format. After the initial 1-year analysis, the analysis shall be repeated at five (5) year intervals. |
| UIC | Form: (31) 401176289 03/06/2017 | If operator wishes to inject at a rate higher than 8,000 barrels/day or increase the Maximum Injection Volume permitted here they must contact COGCC and make an application via Form 4-Sundry Notice. |
| UIC | Form: (31) 401176289 03/06/2017 | Operator is required to perform additional Mechanical Integrity Tests ("MITs") at five (5) year intervals from the first test date reported here. If the downhole well configuration is changed at any time a new MIT must be passed before the well is returned to injection. All injection well MITs must be witnessed by COGCC. |
| UIC | Form: (31) 401176289 03/06/2017 | If operator requests injection rate increase from 8,000 to over 10,000 barrels/day then seismic monitoring will be required. If seismic monitoring is required then operator is required to consult with COGCC regarding placement and design of monitoring system.
|