Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
UIC ENHANCED RECOVERY159994Mule Waterflood Unit
STRACHAN EXPLORATION INC
83130
AC
4/20/2017
CROW
13600
WELD  123
NENE 1 7N60W 6
310566View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
UICForm: (31)
400999278
08/17/2016
Based on a requirement of the Colorado Division of Water Resources to protect the Upper Pierre Aquifer Foundation Energy is required to cement the outer 1st String annulus (between 1st String and hole or Surface String) in the Green #1-1 (API: 05-123-26575) from 1610 ft MD ("Measured Depth", on the Dual Induction-Guard Log #1349684) to surface and in the Wickstrom #6-12 (API: 05-123-32065) from 1630 ft MD (TCOMBO; Comp Density-Comp Neutron-Duel Induction Log #1290757) to surface. This work must be completed prior to approval of the Subsequent versions of the Form 31 and 33s for this unit and two wells.
UICForm: (31)
400999278
08/17/2016
Injection is not authorized until Subsequent version of Mule Waterflood Unit Form 31 and Form 33(s) and Form 26 for at least one injection well are approved.
UICForm: (31)
400999278
08/18/2016
Foundation required to file Form 4-Sundry Notice of Intent to Do Work containing procedure for conversion to injector and wellbore diagram. Sundry must be approved prior to beginning work. (See Form 2 Instructions for "Recompletions: Enhanced Recovery Unit Wells" July 11, 2014.
UICForm: (31)
401209772
04/20/2017
Within thirty (30) days of the commencement of injection operator is required to file a Form 5A-Completed Interval Report: a.Notifying COGCC of the initial injection date, and b.Updating COGCC on the well and formation status.
UICForm: (31)
401209772
04/20/2017
Operator is required to file a Form 4-Sundry Notice with analysis of injected water collected one year after the initial injection date. Minimum analyses are TDS, major cations, and major anions. Data must also be submitted to COGCC Database in Electronic Data Deliverable (EDD) format. After the initial 1-year analysis, the analysis shall be repeated at five (5) year intervals.
UICForm: (31)
401209772
04/20/2017
If operator wishes to inject at a rate higher than 800 barrels/day permitted here they must contact COGCC and make an application via Form 4-Sundry Notice.
UICForm: (31)
401209772
04/20/2017
Operator is required to perform additional Mechanical Integrity Tests ("MITs") at five (5) year intervals starting from the first test date reported here. If the downhole well configuration is changed at any time a new MIT must be passed before the well is returned to injection. All injection well MITs must be witnessed by COGCC.
 
COGIS - Best Management Practice Results
No records to display.