| Engineer | Form: (02) 402881460 01/20/2023 | Operator acknowledges the proximity of the listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Dillard A 4-4 (API NO 123-24185)
Erickson 5-43 (API NO 123-18513)
Erickson A 4-5 (API NO 123-23489)
Cecil 32-34 (API NO 123-23809) |
| Engineer | Form: (02) 402881460 01/20/2023 | Operator acknowledges the proximity of the following non-operated listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
NC Farms 16-32 (API NO 123-34782)
NC Farms 10-32 (API NO 123-34785)
NC Farms 15-32 (API NO 123-34789)
NC Farms 9-32 (API NO 123-34790)
NC Farms 20-32 (API NO 123-34793)
Heinze 44-29 (API NO 123-22341)
Francis 21-8 (API NO 123-27380) |
| Engineer | Form: (02) 402881460 01/20/2023 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (Spud Notice), for the first well/activity on the pad and provide 2 business days spud notice for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j and provide cement coverage from the end of production casing to a minimum of 500' above Niobrara. Verify coverage with cement bond log.
3) Oil-based drilling fluid is to be used only after all aquifers are covered. |
| Engineer | Form: (02) 402881460 01/20/2023 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
2) If a delayed completion, a second test is required between 6-9 months, of if there is pressure above 200 psi, after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance. |
| Permit | Form: (02) 402881460 02/28/2023 | If conductors are preset, operator shall comply with Rule 406.e. |
| Permit | Form: (02) 402881460 02/28/2023 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017). |
| Permit | Form: (02) 402881460 03/20/2023 | Operator will log two (2) wells during the first rig occupation with open-hole resistivity log with gamma-ray log from the kick-off point into the surface casing for the two stratigraphically deepest wells on each side of the pad. |