| Engineer | Form: (02) 402950239 08/08/2022 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j. and provide cement coverage from TD to a minimum of 500' above Niobrara and from 500’ below Sussex to 500’ above Sussex. Verify coverage with a cement bond log.
3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered. |
| Engineer | Form: (02) 402950239 08/08/2022 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation.
2) If a delayed completion, a second test is required between 6-9 months after rig release and must be conducted prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance. |
| Engineer | Form: (02) 402950239 08/08/2022 | Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Noble Energy Inc. 123-10565 State A *41-16
Noble Energy Inc. 123-12441 CPC-Harless *17-1
Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 4 (per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document). Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. Surface and production casing pressures of this offset well list will be actively monitored during stimulation of this well. Records shall be retained and provided to COGCC engineering upon request. If there is indication of communication between the stimulation treatment and an offset well, treatment will be stopped and COGCC Engineering notified.
PDC ENERGY INC 123-44052 Popham *1C
PDC ENERGY INC 123-45747 Harold *6X-202
PDC ENERGY INC 123-45749 Harold *6X-302
PDC ENERGY INC 123-45752 Harold *6Y-312
PDC ENERGY INC 123-45756 Harold *6X-232
PDC ENERGY INC 123-45757 Harold *6Y-202
PDC ENERGY INC 123-45878 Jagged *1N
PDC ENERGY INC 123-45879 Jagged *2N
PDC ENERGY INC 123-45881 Jagged *5N
PDC ENERGY INC 123-45882 Jagged *10N
PDC ENERGY INC 123-45883 Jagged *4N
PDC ENERGY INC 123-45884 Jagged *8N
PDC ENERGY INC 123-45885 Jagged *7N
PDC ENERGY INC 123-45886 Jagged *9N
PDC ENERGY INC 123-45887 Jagged *6N
PDC ENERGY INC 123-45892 Challenger *9N
PDC ENERGY INC 123-45895 Challenger *5N
PDC ENERGY INC 123-45897 Challenger *7N
PDC ENERGY INC 123-48736 Jagged *12N
PDC ENERGY INC 123-48737 Jagged *11N |