| Engineer | Form: (02) 403069327 07/01/2022 | Operator acknowledges the proximity of the following non-operated listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Klein 21-212 (API NO 123-17862)Clemons 15-1 (API NO 123-12896)
Klein 1 (API NO 123-11828)Leonard 3 (API NO 123-11824)
Cantrell 22-12 (API NO 123-17361)Leonard 2 (API NO 123-11823)
Lehfeldt C27-04 (API NO 123-13616)Thoutt 2 (API NO 123-11823)
Travelers 21-8I4 (API NO 123-18514)Leonard 21-16I4 (API NO 123-18509)
Leonard 21-10 (API NO 123-17588)Hanscome 28-4 (API NO 123-17502)
Todd 20-8 (API NO 123-17624)Victor C 19-16 (API NO 123-13509)
Novacek 1 (API NO 123-12347)Johnson R C 29-2 (API NO 123-13187)
Balboa 20-1 (API NO 123-13235)Nix 1 (API NO 123-11926)
Hanscome C 28-1 (API NO 123-11310)Chenoweth 1 (API NO 123-11827)
Balboa C20-4 (API NO 123-15570) |
| Engineer | Form: (02) 403069327 07/01/2022 | Operator acknowledges the proximity of the following non-operated listed wells: Operator agrees to: provide mitigation option 3 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Balboa C20-2 (API NO 123-13250)UPRR 36 Pan Am B 1 (API NO 123-07280) |
| Engineer | Form: (02) 403069327 07/01/2022 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (Spud Notice), for the first well/activity on the pad and provide 48 hour spud notice for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j and provide cement coverage from the end of production casing to a minimum of 500' above Niobrara. Verify coverage with cement bond log.
3) Oil-based drilling fluid is to be used only after all aquifers are covered. |
| Engineer | Form: (02) 403069327 07/01/2022 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance. |