COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
402496882
09/16/2021
Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. 123-09853 LITTLE THOMPSON GAS UNIT *1 123-10699 CRESSWELL *1 123-11588 BEIN * #1 123-12423 Dunklee 2
EngineerForm: (02)
402496882
09/16/2021
Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 4 (per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document). Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. A Bradenhead test will be performed on the offset wells listed below within 30 days prior to the beginning of stimulation of this well. Surface and production casing pressures of this offset well list will be actively monitored during stimulation of this well. Records shall be retained and provided to COGCC engineering upon request. If there is indication of communication between the stimulation treatment and an offset well, treatment will be stopped and COGCC Engineering notified. 123-26143 STARCK *31-18 123-34984 Lamb *41-15 123-40780 SRC Cannon *14-16NHZ 123-40785 SRC Cannon *S-16NHZ 123-44810 MLD *9
EngineerForm: (02)
402496882
09/16/2021
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Comply with Rule 408.j. and provide cement coverage from TD to a minimum of 500' above Niobrara. Verify coverage with a cement bond log. 3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered.
OGLAForm: (04)
403130367
08/15/2022
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well completion(s), well repair/maintenance, well perforating, temporary abandonment activities, additional equipment installation, and/or testing operations with a workover rig, wireline rig, or other heavy equipment do not constitute a nuisance or hazard to public health, welfare and the environment. Due to proximity of building units (BUs) all blowdown gases will be controlled.
OGLAForm: (04)
403130367
08/15/2022
Prior to commencing operations, at a minimum, the operator will provide an informational sheet to the owners/occupants of BUs that are nearby and adjacent to the parcel (at a minimum of 1000 feet) on which the well is located. The sheet will include the operator's contact information and the nature, timing, and expected duration of the completion(s), well repair/maintenance, well perforating, temporary abandonment activities, additional equipment installation, and/or testing operations with a workover rig, wireline rig, or other heavy equipment.
EngineerForm: (04)
403935975
10/21/2024
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (04)
404447907
12/02/2025
1. Submit a Form 4 reporting the results of the operation within 30 days after this well has returned to production. Report the following: a) The total volume of gas or water injected in the well. b) The dates during which injection occurred. c) The total volume of gas or water recovered from the well during withdrawal. d) The dates during which withdrawal occurred e) The well’s shut in pressure after the Blanket fluid has been withdrawn. f) Pressure monitoring data during offset frac operations. 2. All injected and withdrawn gas or water must be reported on a Form 7.
EngineerForm: (04)
404475846
01/07/2026
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (04)
404600657
04/03/2026
Operator shall verify and correct Form 7 reporting volumes to account for injected and produced volumes of water as part of pressure blanket treatment. Current reporting volumes do not appear to account for the treatment.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
402496882
9/17/2021
Kerr-McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.
Drilling/Completion OperationsForm: (02 )
402496882
9/17/2021
Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within one hundred fifty (150) feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators within one hundred fifty (150) feet prior to drilling.
Drilling/Completion OperationsForm: (02 )
402496882
9/17/2021
Open Hole Logging Exception: One of the first wells drilled on the pad will be logged with cased-hole neutron log with gamma-ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run in that well and have those logs attached. The Form 5 for each well shall state "Open Hole Logging Exception - No open-hole logs were run" and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run.
PlanningForm: (04 )
403059160
5/31/2022
Site lighting shall be shielded and directed downward and inward toward operations to avoid glare on public roads and nearby Building Units.
Dust controlForm: (04 )
403059160
5/31/2022
Water will be placed on dirt access roads to mitigate dust as needed.
Noise mitigationForm: (04 )
403059160
5/31/2022
Noise associated with pipe handling, traffic, and other operational activity will be minimized between 7:00 pm and 7:00 am. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units and continuous monitoring will be placed at the appropriate noise points of compliance pursuant to Rule 423.a.(5).
Odor mitigationForm: (04 )
403059160
5/31/2022
Closed, upright tanks are being utilized to mitigate odor.
PlanningForm: (04 )
403935975
10/21/2024
Site lighting will be shielded and directed downward and inward toward operations to avoid glare on public roads and nearby Building Units.
Community Outreach and NotificationForm: (04 )
403935975
10/21/2024
Courtesy notifications will be sent to all parcel owners with building units within 2,000 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources.
Community Outreach and NotificationForm: (04 )
403935975
10/21/2024
Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard.
WildlifeForm: (04 )
403935975
10/21/2024
This location was reviewed using a desktop method to review publicly available wildlife data (including CPW & ECMC data) as well as internal wildlife datasets and aerial imagery. All field personnel are trained to identify wildlife risks and raise concerns noticed during operations with the Kerr McGee's Health, Safety, and Environment (HSE) department.
Dust controlForm: (04 )
403935975
10/21/2024
Water will be placed on dirt access roads to mitigate dust as needed.
Noise mitigationForm: (04 )
403935975
10/21/2024
Noise associated with pipe handling, traffic, and other operational activity will be minimized between 7:00 pm and 7:00 am. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units.
PlanningForm: (04 )
404475846
1/13/2026
Site lighting will be shielded and directed downward and inward toward operations to avoid glare on public roads and nearby Building Units.
Community Outreach and NotificationForm: (04 )
404475846
1/13/2026
Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard.
Community Outreach and NotificationForm: (04 )
404475846
1/13/2026
Courtesy notifications will be sent to all parcel owners with building units within 2,000 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources.
WildlifeForm: (04 )
404475846
1/13/2026
This planned location is located within a native aquatic species buffer. KMOG will implement stormwater BMPs (Including the use of straw wattle) during operations to prevent sediment from leaving the location.
WildlifeForm: (04 )
404475846
1/13/2026
This location was reviewed using a desktop method to review publicly available wildlife data (including CPW & ECMC data) as well as internal wildlife datasets and aerial imagery. All field personnel are trained to identify wildlife risks and raise concerns noticed during operations with the Kerr McGee's Health, Safety, and Environment (HSE) department.
Dust controlForm: (04 )
404475846
1/13/2026
Water will be placed on dirt access roads to mitigate dust as needed.
Noise mitigationForm: (04 )
404475846
1/13/2026
Noise associated with pipe handling, traffic, and other operational activity will be minimized between 7:00 pm and 7:00 am. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units.