| Engineer | Form: (02) 402689756 05/25/2021 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 2 business day spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j. and provide cement coverage from TD to a minimum of 500' above Niobrara. Verify coverage with cement bond log.
3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered. |
| Engineer | Form: (02) 402689756 06/02/2021 | Operator acknowledges the proximity of the listed wells. Operator assures that these offsets will be remediated per the DJ Basin Horizontal Offset Policy (option 4). Operator will submit a Form 42 (“OTHER- AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation.
Operator will assure that the offset well's surface, intermediate, and production casing pressures will be actively monitored during entire stimulation treatment. A bradenhead test will be performed prior to the beginning of stimulation. If there is any indication of communication between the stimulation treatment and the offset well’s intermediate casing, or surface casing in excess of 200 psig, treatment will be stopped and COGCC Engineering notified.
Drake 01N-65W-22-8N (123-40503) |
| Permit | Form: (02) 402689756 06/11/2021 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operation (dated January 5, 2017). |