Engineer | Form: (02 ) 402080794 5/11/2021 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (Spud Notice), for the first well/activity on the pad and provide 2 business days spud notice for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j and provide cement coverage from the end of production casing to a minimum of 500' above Niobrara. Verify coverage with cement bond log.
3) Oil-based drilling fluid is to be used only after all aquifers are covered.
|
Engineer | Form: (02 ) 402080794 5/11/2021 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
|
Permit | Form: (02 ) 402080794 5/12/2021 | If conductors are preset, operator shall comply with Rule 406.e. |
Permit | Form: (02 ) 402080794 5/12/2021 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017). |
OGLA | Form: (02 ) 402080794 5/17/2021 | COA: Operator will drill and complete this well within 18 months of approval of this Form 2. If conditions beyond the control of the Operator prevent compliance with this COA, then the Operator will meet with the COGCC Director and Staff no less than 90 days prior to the compliance deadline. At that meeting, Operator will provide a timeline to finish drilling and completion, and the Director will determine if additional Best Management Practices or Conditions of Approval are necessary and reasonable to protect and minimize impacts to public health, safety, welfare, the environment and wildlife resources. |
Engineer | Form: (04 ) 403286075 1/17/2023 | 1. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Prior to starting Bradenhead mitigation, if a sample has not been collected within the last twelve months collect Bradenhead and production gas samples for laboratory analysis. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results shall be provided to the COGCC within three months of collecting the samples.
3. During the first day of mitigation operator shall implement measures to get an initial estimate of the gas flow rate and/or volume from the Bradenhead. During the shut-in period record pressure data to adequately characterize the build-up. This mitigation plan may be used for six consecutive months.
4. At the conclusion of the six months (6/16/2023), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
Engineer | Form: (04 ) 403286075 1/17/2023 | Shut in Bradenhead pressure shall not exceed 50 psig. |
Engineer | Form: (04 ) 403930659 10/8/2024 | At the conclusion of twelve months (07/29/2025), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
Engineer | Form: (04 ) 403930659 10/8/2024 | Shut in Bradenhead pressure shall not exceed 50 psig.
|