Engineer | Form: (02 ) 402080793 5/11/2021 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (Spud Notice), for the first well/activity on the pad and provide 2 business days spud notice for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j and provide cement coverage from the end of production casing to a minimum of 500' above Niobrara. Verify coverage with cement bond log.
3) Oil-based drilling fluid is to be used only after all aquifers are covered.
|
Engineer | Form: (02 ) 402080793 5/11/2021 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
|
Permit | Form: (02 ) 402080793 5/12/2021 | If conductors are preset, operator shall comply with Rule 406.e. |
Permit | Form: (02 ) 402080793 5/12/2021 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017). |
OGLA | Form: (02 ) 402080793 5/17/2021 | COA: Operator will drill and complete this well within 18 months of approval of this Form 2. If conditions beyond the control of the Operator prevent compliance with this COA, then the Operator will meet with the COGCC Director and Staff no less than 90 days prior to the compliance deadline. At that meeting, Operator will provide a timeline to finish drilling and completion, and the Director will determine if additional Best Management Practices or Conditions of Approval are necessary and reasonable to protect and minimize impacts to public health, safety, welfare, the environment and wildlife resources. |
Engineer | Form: (04 ) 403539791 9/25/2023 | At the conclusion of the six months (3/15/2024), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
Engineer | Form: (04 ) 403539791 9/25/2023 | Shut in Bradenhead pressure shall not exceed 50 psig. |
Engineer | Form: (04 ) 403930691 9/27/2024 | At the conclusion of twelve months (07/17/2025), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
Engineer | Form: (04 ) 403930691 9/27/2024 | Shut in Bradenhead pressure shall not exceed 50 psig. |