| Engineer | Form: (02) 402496708 11/24/2020 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 500' above Niobrara. Verify coverage with cement bond log.
3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered. |
| Engineer | Form: (02) 402496708 11/24/2020 | Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
123-17777 UPRC #5-9L |
| Engineer | Form: (02) 402496708 11/24/2020 | Operator acknowledges the proximity of the non-operated listed well. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
123-12131 UCLI #6-1 |
| Engineer | Form: (02) 402496708 11/24/2020 | Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option 3). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
123-7229 UPRR PAN AM C 1 #41 |
| Engineer | Form: (02) 402496708 11/24/2020 | Operator acknowledges the proximity of the listed wells. Operator assures that this offset will be remediated per the DJ Basin Horizontal Offset Policy (option 4). Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. A Bradenhead test will be performed on the offset wells listed below within 30 days prior to the beginning of stimulation of this well. Surface and production casing pressures of this offset well list will be actively monitored during stimulation of this well. Operator will assure that the offset well’s bradenhead is open and actively monitored during the entire stimulation treatment of this pad. If there is indication of communication between the stimulation treatment and an offset well, treatment will be stopped and COGCC Engineering notified.
123-31492 UPRC P #05-24D
123-31481 BERRY P #08-27D |
| Engineer | Form: (02) 402496708 11/24/2020 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance. |
| Permit | Form: (02) 402496708 01/07/2021 | The existing Oil and Gas Location (ID 416717) for this proposed well is approved for 11 wells. The operator will plug and abandon existing wells on the location so that the number of wells does not exceed 11 wells. If the operator chooses not to plug and abandon any of the existing wells, an amended 2A must be submitted and approved prior to spudding any well that would increase the number of wells on this location to more than 11 wells. |
| Permit | Form: (02) 402496708 01/07/2021 | If conductors are preset, operator shall comply with Notice to Operators: Procedures for Preset Conductors (dated September 1, 2016, revised October 6, 2016). |
| Permit | Form: (02) 402496708 01/07/2021 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017). |
| Permit | Form: (02) 402855529 04/08/2022 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017).
|
| Engineer | Form: (02) 402855529 04/14/2022 | Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
123-31481 BERRY P #08-27D
123-17777 UPRC #5-9L
123-31085 BERRY P #08-18D
123-18517 HSR-SCHELL #14-5
123-19288 HSR-BERRY #2-8
123-19291 HSR-SCHELL #11-5
123-31088 BERRY P #08-29D |
| Engineer | Form: (02) 402855529 04/14/2022 | Operator acknowledges the proximity of the non-operated listed well. Operator agrees to: provide mitigation option 1 or 2 (per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
123-29991 MORALES #31-12 |
| Engineer | Form: (02) 402855529 04/14/2022 | Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document Operator using Option 3. Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
123-07229 UPRR PAN AM C 1 #41 |
| Engineer | Form: (02) 402855529 04/14/2022 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 2 business day spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j. and provide cement coverage from TD to a minimum of 500' above Niobrara and from 500’ below Shannon to 500’ above Shannon. Verify coverage with a cement bond log. |
| Engineer | Form: (02) 402855529 04/14/2022 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation.
2) If a delayed completion, a second test is required between 6-9 months after rig release and must be conducted prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance. |
| Engineer | Form: (04) 403571359 11/03/2023 | Operator shall continue to monitor pressure, and report to ECMC through annual testing. If monitored well conditions meet the thresholds defined by Order 1-232 a new bradenhead test and sundry must be filed.
|
| Engineer | Form: (04) 403631964 12/22/2023 | Operator shall continue to monitor pressure, and report to ECMC through annual testing. If monitored well conditions meet the thresholds defined by Order 1-232 a new bradenhead test and sundry must be filed.
|
| Engineer | Form: (04) 403795532 06/03/2024 | 1. Submit a Form 4 reporting the results of the operation within 30 days after the Pressure Blanket well has returned to production. Report the following:
a) The total volume of gas or water injected in the well.
b) The total volume of gas or water recovered from the well during withdrawal.
c) The well’s shut in pressure after the Blanket fluid has been withdrawn.
d) Pressure monitoring data during offset frac operations.
2. All injected and withdrawn gas or water must be reported on a Form 7. |
| Engineer | Form: (04) 404130444 04/07/2025 | 1) Provide electronic Form 42-Other ("Treatment") two business days ahead of
operations.
2) Per Rule 408.m, operator shall successfully pressure test the production casing prior
to conducting the treatment.
3) During treatment operations, the operator will continuously monitor the surface and
casing pressures of the wellbore being treated. If there is any reason to suspect a
potential downhole failure during treatment operations, stop treatment and contact
ECMC engineering.
4) The Operator will submit the Form 5A, Completed Interval Report within 30 days after
the treatment operations |
| Engineer | Form: (04) 404143205 05/09/2025 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations.
2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
|