Drilling/Completion Operations | Form: (02 ) 401555613 3/2/2019 | Operator will perform anti-collision evaluation of all active (producing, shut-in, of temporarily abandoned) offset wellbores that have the potential of being within 150' feet of the proposed well prior to drilling operations. Notice shall be given to all offset operators prior to drilling.
|
Drilling/Completion Operations | Form: (02 ) 401555613 3/2/2019 | Rule 604.c.I: Upon initial rig-up and at least once every thirty (30) days during drilling operations thereafter, pressure testing of the casing string and each component of the blowout prevention equipment including flange connections shall be performed to seventy percent (70%) of working pressure or seventy percent (70%) of the internal yield of casing, whichever is less. Pressure testing shall be conducted and the documented results shall be retained by the operator for inspection by the Director for a period of one (1) year. Activation of the pipe rams for function testing shall be conducted on a daily basis when practicable.
|
Drilling/Completion Operations | Form: (02 ) 401555613 3/2/2019 | Operator will comply with COGCC policy on bradenhead monitoring during Hydraulic Fracturing Treatment in the Greater Wattenberg Area per policy dated May 29. 2012.
|
Drilling/Completion Operations | Form: (02 ) 401555613 3/2/2019 | Multi Well Open-Hole Logging – Rule 317.p: Alternative Logging Program: One of the first wells drilled on the pad will be logged with open-hole resistivity log and gamma-ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall state “Alternative Logging Program -No open-hole logs were run” and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run. |
Drilling/Completion Operations | Form: (02 ) 402859690 1/18/2022 | Operator will perform anti-collision evaluation of all active (producing, shut-in, of
temporarily abandoned) offset wellbores that have the potential of being within 150'
feet of the proposed well prior to drilling operations. Notice shall be given to all offset
operators prior to drilling. |
Drilling/Completion Operations | Form: (02 ) 402859690 1/18/2022 | Upon initial rig-up and at least once every thirty (30) days during drilling
operations thereafter, pressure testing of the casing string and each component of the
blowout prevention equipment including flange connections shall be performed to
seventy percent (70%) of working pressure or seventy percent (70%) of the internal
yield of casing, whichever is less. Pressure testing shall be conducted and the
documented results shall be retained by the operator for inspection by the Director for
a period of one (1) year. Activation of the pipe rams for function testing shall be
conducted on a daily basis when practicable. |
Drilling/Completion Operations | Form: (02 ) 402859690 1/18/2022 | Alternative Logging Program - One of the first wells drilled on the pad will be logged with Open Hole Resistivity Log and Gamma Ray Log from the kick-off point to into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured while-drilling gamma-ray log. The form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without openhole logs shall clearly state "Alternative Logging Program - No open-hole logs were run" and shall clearly identify (by API#, well name & number) the well in which openhole logs were run. |