Drilling/Completion Operations | Form: (02 ) 401509402 1/25/2019 | If a skid is performed for the subject well, then the only required BOPE tests are for the BOPE connection bonnet seal breaks, as long as a full BOPE test was performed at the beginning of the pad, and as long as all necessary BOPE tests are completed at least every 30 days during the pad operations. |
Drilling/Completion Operations | Form: (02 ) 401509402 1/25/2019 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run. |
Drilling/Completion Operations | Form: (02 ) 401509402 1/25/2019 | Anti-collision: Operator will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators prior to drilling.
|
Drilling/Completion Operations | Form: (02 ) 402689408 7/8/2021 | Operator will perform anti-collision evaluation of all active (producing, shut-in, of
temporarily abandoned) offset wellbores that have the potential of being within 150'
feet of the proposed well prior to drilling operations. Notice shall be given to all offset
operators prior to drilling. |
Drilling/Completion Operations | Form: (02 ) 402689408 7/8/2021 | Upon initial rig-up and at least once every thirty (30) days during drilling operations
thereafter, pressure testing of the casing string and each component of the blowout
prevention equipment including flange connections shall be performed to seventy
percent (70%) of working pressure or seventy percent (70%) of the internal
yield of casing, whichever is less. Pressure testing shall be conducted and the
documented results shall be retained by the operator for inspection by the Director for
a period of one (1) year. Activation of the pipe rams for function testing shall be
conducted on a daily basis when practicable. |
Drilling/Completion Operations | Form: (02 ) 402689408 7/8/2021 | Alternative Logging Program - One of the first wells drilled on the pad will be logged
with Open Hole Resistivity Log and Gamma Ray Log from the kick-off point to into the
surface casing. All wells on the pad will have a cement bond log with gamma-ray run
on production casing (or on intermediate casing if production liner is run) into the
surface casing. The horizontal portion of every well will be logged with a measuredwhile-
drilling gamma-ray log. The form 5, Completion Report, for each well on the pad
will list all logs run and have those logs attached. The Form 5 for a well without openhole
logs shall clearly state "Alternative Logging Program - No open-hole logs were
run" and shall clearly identify (by API#, well name & number) the well in which openhole
logs were run. |