| Engineer | Form: (02) 401795622 11/05/2018 | Operator acknowledges the proximity of the listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Marie D 4-9 (API NO 123-15123)Karch White D 9-1 (API NO 123-16282)
Gittlein Blue D 4-08 (API NO 123-16139)Guttersen D 04-21 (API NO 123-27102)
Art Red D 9-16 (API NO 123-16950)Karch Blue D 4-02 (API NO 123-16137)
Guttersen 9-15 (API NO 123-15833)Marie D 4-10 (API NO 123-13164)
Art Red D 9-4J (API NO 123-16254)Art Red D 9-10 (API NO 123-16948)
Gittlein White D 9-2 (API NO 123-16367)Guttersen D 03-33D (API NO 123-31910)
Art Red D 9-14 (API NO 123-16949)Marie D 4-23 (API NO 123-22933)
Karch D 4-17 (API NO 123-27306)HSR Tim Gittlein 6-9 (API NO 123-18003)
Art Red D 9-11 (API NO 123-16947)HSR Tim Gittlein 3-9 (API NO 123-18000)
Marie D 4-3 (API NO 123-15122)Marie D 4-6 (API NO 123-13170)
Spike St GWS D 16-01 (API NO 123-15904)Spike St GWS D 16-03 (API NO 123-15906)
Lindsay D 33-2 (API NO 123-13155)Volley State D 10-13 (API NO 123-24042)
Spike St GWS D 10-12 (API NO 123-15930)Becca D 3-12 (API NO 123-17287)
Becca D 3-13 (API NO 123-17288)Aloysius 34-7 (API NO 123-13238)
|
| Engineer | Form: (02) 401795622 11/05/2018 | Operator acknowledges the proximity of the following non-operated listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Two E Ranch 1-4 (API NO 123-11195)Two E Ranch 4-10 (API NO 123-14025)
Two E Ranch 2-10 (API NO 123-13791)
|
| Engineering Tech | Form: (02) 401795622 11/05/2018 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (Spud Notice), for the first well/activity on the pad and provide 48 hour spud notice for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j and provide cement coverage from the end of production casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Oil-based drilling fluid is to be used only after all aquifers are covered.
|
| Engineer | Form: (02) 401795622 11/05/2018 | Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.:
1) Within 60 days of rig release, prior to stimulation.
2) 6 months after rig release, prior to stimulation.
3) Within 30 days of first production, as reported on Form 5A.
|
| Engineer | Form: (02) 402358183 07/10/2020 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with cement bond log.
3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered. |
| Engineer | Form: (02) 402358183 07/10/2020 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
|
| Engineer | Form: (02) 402358183 07/10/2020 | Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
123-11195 PDC ENERGY INC TWO E RANCH *1-4
123-13155 NOBLE ENERGY INC LINDSAY C *33-2
123-13164 NOBLE ENERGY INC MARIE D *4-10
123-13170 NOBLE ENERGY INC MARIE D *4-6
123-15122 NOBLE ENERGY INC MARIE D *4-3
123-15123 NOBLE ENERGY INC MARIE *D4-9
123-15833 NOBLE ENERGY INC GUTTERSEN *9-15
123-15904 NOBLE ENERGY INC SPIKE ST GWS *D 16-01
123-16137 NOBLE ENERGY INC KARCH BLUE *D 4-02
123-16139 NOBLE ENERGY INC GITTLEIN BLUE *D 4-08
123-16254 NOBLE ENERGY INC ART RED *D 9-4J
123-16282 NOBLE ENERGY INC KARCH WHITE *D 9-1
123-16367 NOBLE ENERGY INC GITTLEIN WHITE *D 9-2
123-16947 NOBLE ENERGY INC ART RED D *9-11
123-16948 NOBLE ENERGY INC ART RED D *9-10
123-16949 NOBLE ENERGY INC ART RED *D 9-14
123-16950 NOBLE ENERGY INC ART RED D *9-16
123-17287 NOBLE ENERGY INC BECCA D *3-12
123-17288 NOBLE ENERGY INC BECCA *D 3-13
123-18000 NOBLE ENERGY INC HSR TIM GITTLEIN *3-9
123-18003 NOBLE ENERGY INC HSR TIM GITTLEIN *6-9
123-22933 NOBLE ENERGY INC MARIE D *4-23
123-24042 NOBLE ENERGY INC VOLLEY STATE D *10-13
123-27306 NOBLE ENERGY INC KARCH D *4-17
123-27102 NOBLE ENERGY INC GUTTERSEN D *04-21
123-31910 NOBLE ENERGY INC GUTTERSEN D *03-33D |
| Permit | Form: (02) 402358183 07/16/2020 | If location is not constructed by 2A expiration 10/28/2024, a refile Form 2A must be approved prior to location construction. |