| Engineer | Form: (02) 401795619 11/05/2018 | Operator acknowledges the proximity of the listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Two E Ranches 1 (API NO 123-07510)Two E Ranch 1-4 (API NO 123-11195)
NX 1 (API NO 123-11926)Novacek 1 (API NO 123-12347)
Aloysius 34-1 (API NO 123-13109)Lindsay C 33-2 (API NO 123-13155)
Lindsay 33-3 (API NO 123-13156)Lindsay 33-4 (API NO 123-13157)
Lindsay 33-8 (API NO 123-13161)Lindsay 33-5 (API NO 123-13165)
Lindsay 33-6 (API NO 123-13166)Lindsay 33-7 (API NO 123-13167)
Aloysius 34-7 (API NO 123-13238)Lehfeldt C 27-04 (API NO 123-13616)
Lindsay C 33-14 (API NO 123-14700)Lindsay C 33-15 (API NO 123-14713)
Lindsay C 33-9 (API NO 123-14722)Aloysius 34-8 (API NO 123-14752)
Marie D 4-3 (API NO 123-15122)Lehfeldt C 27-5 (API NO 123-15429)
Lehfeldt C 27-12 (API NO 123-15431)Lehfeldt C 27-13 (API NO 123-15432)
Karch Blue D 4-02 (API NO 123-16137)Aloysius C 34-99HZ (API NO 123-32694)
|
| Engineer | Form: (02) 401795619 11/05/2018 | Operator acknowledges the proximity of the following non-operated listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Hanscome C 28-1 (API NO 123-11310)
|
| Engineer | Form: (02) 401795619 11/05/2018 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (Spud Notice), for the first well/activity on the pad and provide 48 hour spud notice for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j and provide cement coverage from the end of production casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Oil-based drilling fluid is to be used only after all aquifers are covered.
|
| Engineer | Form: (02) 401795619 11/05/2018 | Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.:
1) Within 60 days of rig release, prior to stimulation.
2) 6 months after rig release, prior to stimulation.
3) Within 30 days of first production, as reported on Form 5A.
|
| Permit | Form: (02) 401795619 12/03/2018 | COGCC COA: Operator will insure the wellbore beyond the unit boundary setback is physically isolated and is not completed. In the Operator Comments on the Form 5A the operator will (1) report the footages from the section lines of the bottom of the completed interval (2) describe how the wellbore beyond the unit boundary setback is physically isolated and (3) certify that none of the wellbore beyond the setback was completed.
|
| Engineer | Form: (04) 403374267 05/02/2023 | Operator acknowledges the proximity of the listed wells. Operator assures that this offset will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document (option 4). Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. Operator will set a downhole plug above the Niobrara formation top. A Bradenhead test will be performed on the offset wells listed below within 30 days prior to the beginning of stimulation of this well. Surface and production casing pressures of this offset well list will be actively monitored during stimulation of this well. Operator will assure that the offset well’s bradenhead is open and actively monitored during the entire stimulation treatment of this pad. If there is indication of communication between the stimulation treatment and an offset well, treatment will be stopped and COGCC Engineering notified.
Lindsay C33-08 (05-123-13161)
|