WELL05-123-48931Guttersen
C28-745
NOBLE ENERGY INC
100322
PR
5/24/2023
WATTENBERG
90750
WELD  123
SWSE 33 4N64W 6
459542View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
401795619
11/05/2018
Operator acknowledges the proximity of the listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Two E Ranches 1 (API NO 123-07510)Two E Ranch 1-4 (API NO 123-11195) NX 1 (API NO 123-11926)Novacek 1 (API NO 123-12347) Aloysius 34-1 (API NO 123-13109)Lindsay C 33-2 (API NO 123-13155) Lindsay 33-3 (API NO 123-13156)Lindsay 33-4 (API NO 123-13157) Lindsay 33-8 (API NO 123-13161)Lindsay 33-5 (API NO 123-13165) Lindsay 33-6 (API NO 123-13166)Lindsay 33-7 (API NO 123-13167) Aloysius 34-7 (API NO 123-13238)Lehfeldt C 27-04 (API NO 123-13616) Lindsay C 33-14 (API NO 123-14700)Lindsay C 33-15 (API NO 123-14713) Lindsay C 33-9 (API NO 123-14722)Aloysius 34-8 (API NO 123-14752) Marie D 4-3 (API NO 123-15122)Lehfeldt C 27-5 (API NO 123-15429) Lehfeldt C 27-12 (API NO 123-15431)Lehfeldt C 27-13 (API NO 123-15432) Karch Blue D 4-02 (API NO 123-16137)Aloysius C 34-99HZ (API NO 123-32694)
EngineerForm: (02)
401795619
11/05/2018
Operator acknowledges the proximity of the following non-operated listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Hanscome C 28-1 (API NO 123-11310)
EngineerForm: (02)
401795619
11/05/2018
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (Spud Notice), for the first well/activity on the pad and provide 48 hour spud notice for all subsequent wells drilled on the pad. 2) Comply with Rule 317.j and provide cement coverage from the end of production casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Oil-based drilling fluid is to be used only after all aquifers are covered.
EngineerForm: (02)
401795619
11/05/2018
Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.: 1) Within 60 days of rig release, prior to stimulation. 2) 6 months after rig release, prior to stimulation. 3) Within 30 days of first production, as reported on Form 5A.
PermitForm: (02)
401795619
12/03/2018
COGCC COA: Operator will insure the wellbore beyond the unit boundary setback is physically isolated and is not completed. In the Operator Comments on the Form 5A the operator will (1) report the footages from the section lines of the bottom of the completed interval (2) describe how the wellbore beyond the unit boundary setback is physically isolated and (3) certify that none of the wellbore beyond the setback was completed.
EngineerForm: (04)
403374267
05/02/2023
Operator acknowledges the proximity of the listed wells. Operator assures that this offset will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document (option 4). Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. Operator will set a downhole plug above the Niobrara formation top. A Bradenhead test will be performed on the offset wells listed below within 30 days prior to the beginning of stimulation of this well. Surface and production casing pressures of this offset well list will be actively monitored during stimulation of this well. Operator will assure that the offset well’s bradenhead is open and actively monitored during the entire stimulation treatment of this pad. If there is indication of communication between the stimulation treatment and an offset well, treatment will be stopped and COGCC Engineering notified. Lindsay C33-08 (05-123-13161)
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
401795619
12/4/2018
Anti-collision: Prior to drilling operations, Operator will perform an anti-collision scan of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision scan will include definitive MWD or gyro surveys of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well will only be drilled if the anti-collision scan results indicate that there is not a risk for collision, or harm to people or the environment. For the proposed well, upon conclusion of drilling operations, an as constructed gyro survey will be submitted to COGCC with the Form 5.
Drilling/Completion OperationsForm: (02 )
401795619
12/4/2018
During and Post stimulation: Noble Energy will comply with the COGCC Policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated 5/29/12.
Drilling/Completion OperationsForm: (02 )
401795619
12/4/2018
One of the first wells drilled on the pad will be logged with open hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open hole logs were run.