| Drilling/Completion Operations | Form: (02 ) 401752126 9/26/2018 | HighPoint will adhere to the COGCC Policy for Bradenhead Monitoring effective 5/29/12. |
| Drilling/Completion Operations | Form: (02 ) 401752126 9/26/2018 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log
and Gamma Ray Log from the kick-off point into the surface casing. All wells on the
pad will have a cement bond log with gamma-ray run on production casing (or on
intermediate casing if production liner is run) into the surface casing. The horizontal
portion of every well will be logged with a measured-while-drilling gamma-ray log. The
Form 5, Completion Report, for each well on the pad will list all logs run and have
those logs attached. The Form 5 for a well without open-hole logs shall clearly state
“No open-hole logs were run” and shall clearly identify (by API#, well name & number)
the well in which open-hole logs were run. |
| Drilling/Completion Operations | Form: (02 ) 401771856 10/3/2018 | HighPoint will adhere to the COGCC Policy for Bradenhead Monitoring effective
5/29/12. |
| Drilling/Completion Operations | Form: (02 ) 401771856 10/3/2018 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log
and Gamma Ray Log from the kick-off point into the surface casing. All wells on the
pad will have a cement bond log with gamma-ray run on production casing (or on
intermediate casing if production liner is run) into the surface casing. The horizontal
portion of every well will be logged with a measured-while-drilling gamma-ray log. The
Form 5, Completion Report, for each well on the pad will list all logs run and have
those logs attached. The Form 5 for a well without open-hole logs shall clearly state
“No open-hole logs were run” and shall clearly identify (by API#, well name & number)
the well in which open-hole logs were run. |