| Engineer | Form: (02) 401642927 05/31/2018 | Operator acknowledges the proximity of the following non-operated listed well: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
CHAMPLIN 1 (API NO 123-10877)
|
| Engineer | Form: (02) 401642927 05/31/2018 | Operator acknowledges the proximity of the listed non-operated well: Operator agrees to: provide mitigation option 3 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of these wells.
UPRR 13-15 (API NO 123-09341)
|
| Engineer | Form: (02) 401642927 05/31/2018 | Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release and prior to stimulation or
2) If a delayed completion, 6 months after rig release and prior to stimulation.
3) Within 30 days after first production, as reported on Form 5A.
If a Bradenhead test reports a surface casing pressure greater than 200 psig, stimulation is not allowed until the Engineering Supervisor has been consulted.
|
| Engineer | Form: (02) 401642927 05/31/2018 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (Spud Notice), for the first well/activity on the pad and provide 48 hour spud notice for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j and provide cement coverage from the end of production casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered.
|
| Engineer | Form: (04) 403994792 12/06/2024 | 1) Well last produced November 2024, and has been designated as Inactive. Within 6 months of a Well becoming Inactive action must be taken. No later than May 2025, this well must:
A. Be plugged and Abandoned,
B. Return to production so that it is no longer an Inactive Well,
C. Have an approved Form 5B, Inactive Well Notice,
D. Be designated as Out of Service by submitting a Form 6A, Out of Service Designation.
2) A Form 5A, Completed Interval Report, is required to report all plugs currently downhole which isolate any perforated interval.
3) The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status.
|