Engineer | Form: (02 ) 401291017 11/2/2017 | Operator acknowledges the proximity of the non-operated listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
SAWYER 32-2 (API 05-123-14272)
HASKINS 1 (API 05-001-08831)
BERGMAN 1 (API 05-001-07415)
MELISSA 1 (API 05-001-07623)
TIPPERARY 1 (API 05-001-08116)
RAINBOW 1 (API 05-001-08117)
Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option 3). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
HELEN M PENROD 1 (API 05-001-06867)
PENROD 4-3 (API 05-001-08766)
HASKINS 4-12 (API 05-001-09199)
UPRR 33 PAN AM NAV 1 (API 05-001-06229)
|
Engineer | Form: (02 ) 401291017 11/2/2017 | Bradenhead tests shall be performed according to the following schedule and the Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release and prior to stimulation and
2) If a delayed completion, 6 months after rig release and prior to stimulation.
3) Within 30 days after first production, as reported on Form 5A.
|
Engineer | Form: (02 ) 401291017 11/2/2017 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with cement bond log.
|
Engineer | Form: (02 ) 401291017 11/2/2017 | Per operator request the surface casing setting depth changed to 1500' per DJ Basin policy, adjust cement volume accordingly |
Engineer | Form: (02 ) 401291017 11/2/2017 | Oil-based drilling fluid is to be used only after all fresh water aquifers are covered |
Engineer | Form: (02 ) 401291017 11/2/2017 | In the operator comment box of the Form 5A, operator must certify that the operator did not stimulate within 150’ of an existing wellbore operated by a different operator without a signed waiver from that operator and documentation exists to demonstrate this fact.
This will include existing wellbores from a different operator that were not originally within 150’ of the planned wellbore, but did end up within 150’ of the as-drilled wellbore.
Operator agrees to provide this documentation within two business days via email if requested by COGCC staff.
Additionally for the wells below, operator must provide in that same operator comment box, the name and API of the well, nearest perforation to that well, and final separation (wellbore to wellbore distance) from that well:
|
Engineer | Form: (02 ) 401291017 11/2/2017 | 317.r, 317.s apply to following wells,
Bergmann 1 (API 05-123-07415) GWOG
|