Engineer | Form: (02 ) 401160937 5/11/2017 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Shannon to 200’ above Sussex. Verify coverage with cement bond log. |
Engineer | Form: (02 ) 401160937 5/11/2017 | Bradenhead tests shall be performed according to the following schedule and the Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release and prior to stimulation and
2) If a delayed completion, 6 months after rig release and prior to stimulation.
3) Within 30 days after first production, as reported on Form 5A. |
Engineer | Form: (02 ) 401160937 5/11/2017 | Operator acknowledges the proximity of the non-operated listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
05-123-11400, LEONARD 3-21J
05-123-11402, LEONARD 4-21J |
Engineer | Form: (04 ) 402040147 7/9/2019 | 1) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2) At the conclusion of the cycles, submit a Sundry that summarizes current well condition and includes the flow rate information and pressure data. |
Engineer | Form: (04 ) 402246870 12/3/2019 | Conduct a new bradenhead test and submit the Form 17 within ten days of the test to demonstrate compliance with Order 1-232 and current wellbore conditions. |