| Drilling/Completion Operations | Form: (02 ) 401219455 5/4/2017 | Fifth Creek Energy will mitigate any offset wells that are determined to be of concern within 1500’ of any well prior to fracturing operations per the company wide wellbore protection plan. Offset wells of concern within 1500’ of a proposed fracturing operation will be shut in, the pressure will be monitored, and a 5000lb psi well head will be installed. |
| Drilling/Completion Operations | Form: (02 ) 401219455 5/4/2017 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name and number) the well in which open-hole logs were run. |