Engineer | Form: (02 ) 401203296 3/14/2017 | Bradenhead tests shall be performed according to the following schedule and the Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release and prior to stimulation and
2) If a delayed completion, 6 months after rig release and prior to stimulation.
3) Within 30 days after first production, as reported on Form 5A. |
Engineer | Form: (02 ) 401203296 3/14/2017 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with cement bond log. |
Engineer | Form: (02 ) 401203296 3/14/2017 | Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
05-123-16986, HSR-IAN 13-20
05-123-15273, UPRC 29-6J
05-123-15274, UPRC 29-3J
05-123-15837, UPRC 29-4J
05-123-16101, HSR-EGGLER 14-29
05-123-16875, HSR-RANIN 13-29
05-123-16880, HSR-PANTALEO 10-29A
05-123-16881, HSR-PETERSON 12-29
05-123-19166, HSR-EGGLER 11-29
05-123-19167, HSR-AUGUST 15-29
05-123-21614, WARDELL 18-29
05-123-22311, WARDELL 21-29
05-123-15004, WARD 30-1J
05-123-15879, HSR-MULBERG 16-30
05-123-17072, HSR-TOO DEVINE 1-31
05-123-17095, MCGUCKIN H 32-2J
05-123-17423, MCGUCKIN H 32-3 |
Engineer | Form: (02 ) 401203296 3/14/2017 | Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option 3). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
05-123-16014, WARDELL 32-29 |