Engineer | Form: (02 ) 401168177 3/3/2017 | Please email documentation, including third party verification, that the operator did not stimulate within 150’ of an existing wellbore operated by a different operator without a signed waiver from that operator within 10 days of first sale from this well to mike.hickey@state.co.us with subject line Stimulation Setback Verification. |
Engineer | Form: (02 ) 401168177 3/3/2017 | In the operator comment box of the Form 5A, operator must certify that the operator did
not stimulate within 150’ of an existing wellbore operated by a different operator without
a signed waiver from that operator and documentation exists to demonstrate this fact.
This will include existing wellbores from a different operator that were not originally
within 150’ of the planned wellbore, but did end up within 150’ of the as-drilled wellbore.
Operator agrees to provide this documentation within two business days via email if
requested by COGCC staff.
Additionally for the wells below, operator must provide in that same operator comment
box, the name and API of the well, nearest perforation to that well, and final separation
(wellbore to wellbore distance) from that well:
Ward #M-20-19HCN 123-43655
Ward #N-20-19HCN 123-43661
Ward #O-20-19HCN 123-43657
Ward #-P20-19HCN 123-43658
Ward #-Q20-19HCN 123-43659
Ward #-R20-19HCN 123-43662
Ward #-S20-19HCN 123-43660
Ward #-T20-19HCN 123-43656
Ward #-U20-19HCN 123-43653
|
Engineer | Form: (02 ) 401168177 3/6/2017 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU for the first well activity with a rig on the pad and provide 48 hour spud notice for each subsequent well drilled on the pad.
2) Comply with Rule 317.j and provide cement coverage from TD to a minimum of 200' above the Niobrara. Verify coverage with cement bond log.
3) Operator has indicated that no oil based drilling fluids are to be used on this location.
|
Engineer | Form: (02 ) 401168177 3/6/2017 | Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release and prior to stimulation and
2) If a delayed completion, 6-7 months after rig release and prior to stimulation.
3) Within 30 days after first production, as reported on Form 5A.
|
Engineer | Form: (04 ) 403059753 5/26/2022 | 1. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Prior to starting Bradenhead mitigation, if a sample has not been collected within the last twelve months collect Bradenhead and production gas samples for laboratory analysis. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results shall be provided to the COGCC within three months of collecting the samples.
3. During the first day of mitigation operator shall implement measures to get an initial estimate of the gas flow rate and/or volume from the Bradenhead. During the shut-in period record pressure data to adequately characterize the build-up. This mitigation plan may be used for six consecutive months.
4. At the conclusion of the six months, conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data.
|
Engineer | Form: (04 ) 403059753 5/26/2022 | Shut in Bradenhead pressure shall not exceed 50 psig.
|
Engineer | Form: (04 ) 403253767 12/8/2022 | 1. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Prior to starting Bradenhead mitigation, if a sample has not been collected within the last twelve months collect Bradenhead and production gas samples for laboratory analysis. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results shall be provided to the COGCC within three months of collecting the samples.
3. During the first day of mitigation operator shall implement measures to get an initial estimate of the gas flow rate and/or volume from the Bradenhead. During the shut-in period record pressure data to adequately characterize the build-up. This mitigation plan may be used for six consecutive months.
4. At the conclusion of the six months (5/07/2023), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
Engineer | Form: (04 ) 403253767 12/8/2022 | Shut in Bradenhead pressure shall not exceed 50 psig. |
Engineer | Form: (04 ) 403557369 10/12/2023 | At the conclusion of the six months (4/12/2024), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
Engineer | Form: (04 ) 403557369 10/12/2023 | Shut in Bradenhead pressure shall not exceed 50 psig. |
Engineer | Form: (04 ) 403938317 10/14/2024 | At the conclusion of twelve months (04/18/2025), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
Engineer | Form: (04 ) 403938317 10/14/2024 | Shut in Bradenhead pressure shall not exceed 50 psig. |