Storm Water/Erosion Control | Form: (02 ) 401090401 11/4/2016 | Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with oil and gas development throughout the State of Colorado. BMPs will be constructed as necessary to prevent stormwater from leaving the construction site. BMPs used will vary according to the location, and will remain until the pad is reclaimed |
Material Handling and Spill Prevention | Form: (02 ) 401090401 11/4/2016 | Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with oil and gas operations throughout the State of Colorado.
• Materials and fluids will be stored in a neat and orderly fashion.
• Waste will be collected regularly and disposed of at an offsite facility.
• Prompt cleanup is required of spills to minimize waste materials entering the stormwater runoff.
• Drip pans will be used during fueling and maintenance to contain spills or leaks.
• Cleanup of trash and discarded material will be done at the end of the work day.
• Cleanup will consist of monitoring the road, location and any other work areas.
• Material to be cleaned up includes trash, scrap, and contaminated soil.
|
Drilling/Completion Operations | Form: (02 ) 401090401 11/4/2016 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.
|