Engineer | Form: (02 ) 400989864 5/5/2016 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from end of the 7-inch string to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
|
Engineer | Form: (02 ) 400989864 5/5/2016 | Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.
1) Within 60 days of rig release, prior to stimulation.
2) 6 months after rig release, prior to stimulation.
3) Within 30 days of first production, as reported on Form 5A. |
Engineer | Form: (02 ) 400989864 5/5/2016 | Operator acknowledges the proximity of the listed non-operated well. Operator assures that this offset well will be remediated per the DJ Basin Horizontal Offset Policy (option 3). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
05-123-09414, CRYSTAL STATE 13-4
05-123-09837, STATE 1-4
05-123-65212, STATE-KRAUSE 1
05-123-09256, CRYSTAL-AMOCO 24-5
05-123-09735, UPRR 5-1
05-123-22555, LOST CREEK DEVELOPMENT 20 |
Engineer | Form: (04 ) 401397757 10/17/2017 | 1) This Form 4 makes changes to the approved Form 2 and must be displayed with the Form 2 while drilling.
2) In a comment on the Form 5A submit tab, operator will provide the following information for any other wells owned by another operator within 150’ of the current as-drilled wellbore: well name and API number, the depth of the perforation in this well nearest to the treated interval of the offset well, and the distance between the wells at that depth to ensure compliance with 317.s Statewide Fracture Stimulation Setback. |