Community Outreach and Notification | Form: (02 ) 400651407 6/22/2016 | Prior to any new operations, provide notification to landowners within 1/2 mile |
Community Outreach and Notification | Form: (02 ) 400651407 6/22/2016 | Prior to any new operations, provide designated staff member the following: A site plan for site preparation, mobilization, and demobilization; A plan for interim reclamation and re-vegetation and final reclamation of the site; A plan for noise, light, and dust mitigation, to the extent feasible and where applicable ; A traffic management plan; Update of this information if any plans change during operations |
Material Handling and Spill Prevention | Form: (02 ) 400651407 6/22/2016 | Utilize steel-rim berms around tanks and separators instead of sand or soil |
Construction | Form: (02 ) 400651407 6/22/2016 | Maximize equipment and wellhead setbacks from occupied buildings and residences |
Drilling/Completion Operations | Form: (02 ) 400651407 6/22/2016 | Closed-top tanks will utilize backpressure systems that exert a minimum of four (4) ounces of backpressure and a maximum that does not exceed the pressure rating of the tank to facilitate gathering and combustion of tank.
|
Drilling/Completion Operations | Form: (02 ) 400651407 6/22/2016 | Upon initial rig-up and at least once every thirty (30) days during drilling operations thereafter, pressure testing of the casing string and each component of the blowout prevention equipment including flange connections will be performed to seventy percent (70%) of working pressure or seventy percent (70%) of the internal yield of casing, whichever is less. Pressure testing shall be conducted and the documented results will be retained by the operator for inspection by the Director for a period of one (1) year. Activation of the pipe rams for function testing shall be conducted on a daily basis when practicable.
|
Drilling/Completion Operations | Form: (02 ) 400651407 6/22/2016 | Adequate blowout prevention equipment will be used on all well servicing operations.
|
Drilling/Completion Operations | Form: (02 ) 400651407 6/22/2016 | Backup stabbing valves shall be required on well servicing operations during reverse circulation. Valves shall be pressure tested before each well servicing operation using both low-pressure air and high-pressure fluid.
|
Drilling/Completion Operations | Form: (02 ) 400651407 6/22/2016 | Prior to drilling operations, Operator will perform an anti-collision scan of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision scan will include definitive MWD or gyro surveys of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well will only be drilled if the anti-collision scan results indicate that there is not a risk for collision, or harm to people or the environment. For the proposed well, upon conclusion of drilling operations, an as-constructed gyro survey will be submitted to COGCC with the Form 5.
|
Drilling/Completion Operations | Form: (02 ) 400651407 6/22/2016 | Encana will comply with the “COGCC Policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg Area”, dated May 29, 2012.
|
Drilling/Completion Operations | Form: (02 ) 400651407 6/22/2016 | Utilize close-loop system for drilling and completion operations |
Drilling/Completion Operations | Form: (02 ) 400651407 6/22/2016 | Utilize multistage pressure separation in conjunction with a vapor recover unit for new wells |
Drilling/Completion Operations | Form: (02 ) 400651407 6/22/2016 | One of the first wells drilled on the pad will be logged with Cased hole Pulsed Neutron Log with Gamma Ray Log from the kick-off point to into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run in that well and have those logs attached. The Form 5 for each well shall clearly state “No open-hole logs were run” and shall reference the Rule 317.p Exception granted for the well.
|