| Engineer | Form: (02) 400916345 11/03/2015 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (Spud Notice), for the first well/activity on the pad and provide 48 hour spud notice for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j and provide cement coverage from the end of production casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
|
| Engineer | Form: (02) 400916345 05/26/2016 | Revised distance from proposed wellbore to nearest existing or permitted wellbore belonging to another operator, including plugged wells, from 338’ to 2945' to the VON HAZMBURG 5, on the Drilling & Waste Plans tab. |
| Engineer | Form: (02) 400916345 05/31/2016 | Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.:
1) Within 60 days of rig release, prior to stimulation.
2) 6 months after rig release, prior to stimulation.
3) Within 30 days of first production, as reported on Form 5A.
|