| Drilling/Completion Operations | Form: (02 ) 400887481 11/30/2015 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run. |
| Drilling/Completion Operations | Form: (02 ) 400887481 11/30/2015 | Anti-collision: EOG Resources, Inc. will perform an anti-collision evaluation of all active (producing, shut in or temporarily abandoned) offset well bores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators prior to drilling.
Prior to drilling operations, EOG will perform an anti-collision review of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision review may include MWD or gyro surveys of the offset wells with included error of uncertainty per survey instrument and compared against the proposed well path with tis respective error of uncertainty. If the current surveys do not exist for the offset wells, EOG may have gyro surveys conducted to verify bottom hole location. EOG maybe also perform IFR (In Field Reference) to increase survey accuracy. The proposed well will only be drilled if the anti-collision review results indicate that the risk of collision is sufficiently low as defined by the anti-collision plan, with separation factors greater than 1.5 or if the risk of collision has been mitigated through other means including shutting in wells, pugging wells, increased drilling fluid in the event of lost returns or as appropriate for the specific situation. In the event of an increased risk of collision, that risk will be mitigated to prevent harm to people, environment or property. A MWD directional survey for the proposed well will be submitted to the COGCC with Form 5 upon completion of drilling operations.
|
| Drilling/Completion Operations | Form: (02 ) 401619203 6/8/2018 | HighPoint will adhere to the COGCC Policy for Bradenhead Monitoring effective 5/29/12. |
| Drilling/Completion Operations | Form: (02 ) 401619203 6/8/2018 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run. |
| Drilling/Completion Operations | Form: (02 ) 401726762 8/8/2018 | HighPoint will adhere to the COGCC Policy for Bradenhead Monitoring effective
5/29/12. |
| Drilling/Completion Operations | Form: (02 ) 401726762 8/8/2018 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log
and Gamma Ray Log from the kick-off point into the surface casing. All wells on the
pad will have a cement bond log with gamma-ray run on production casing (or on
intermediate casing if production liner is run) into the surface casing. The horizontal
portion of every well will be logged with a measured-while-drilling gamma-ray log. The
Form 5, Completion Report, for each well on the pad will list all logs run and have
those logs attached. The Form 5 for a well without open-hole logs shall clearly state
“No open-hole logs were run” and shall clearly identify (by API#, well name & number)
the well in which open-hole logs were run. |