COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
UICForm: (02 )
400703571
12/10/2014
1.Daily drilling reports are required. 2.For all new drill Underground Injection Control wells a suite of open-hole Resistivity/Gamma Ray and Density/Neutron logs is required from Surface Casing shoe to TD. A PDF, TIFF, or PDS visual image and a LAS or DLIS file version of each log is required. 3.For all new and converted Underground Injection Control wells a Cement Bond Log (CBL) is a required on the cased portions of the hole from the bottom of the casing to the top of the next shallower casing string for all casing strings other than the Surface Casing. Only a PDF, TIFF, or PDS visual image is required. 4.A Mudlog is required containing at least the following information: a)Rate of Penetration Log, and b)The location of any drilling breaks or zones of lost circulation 5.A static water level taken after perforation in cased wells and prior to any stimulation in either cased or open-hole wells. 6.Prior approval of Form 4 Sundry Notice is required for Step Rate and Injectivity Tests. 7.Retrieve water sample(s) from injection zone(s) before stimulating formation, Step Rate Test, or Injectivity Test. 8.A Transient Injectivity Test is required to determine the Maximum Daily Injection Rate in barrels per day (bbls/day). 9.A Transient Injectivity Test or a Step Rate Test is required to determine the Maximum Injection Pressure in pounds per square inch (psi). 10.Injection is not authorized until approval of Forms 31 and 33. 11.Operator must pick all formation tops from surface to TD.
EngineerForm: (02 )
400703571
1/14/2015
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.j and provide cement coverage from end of 7” casing to surface. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to using the well.
UICForm: (04 )
402069075
12/18/2019
Operator is approved to increase daily injection rate from 15,000 to 17,500 barrels per day. In June 2020 operator may apply for a further rate increase. Seismic activity is to be monitored. Contact COGCC if there are any events of 2.0M Richter or higher.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Traffic controlForm: (02 )
400703571
1/15/2015
RULE 604.c.D: If required by the local government, a traffic plan shall be coordinated with the local jurisdiction prior to commencement of move in and rig up. Any subsequent modification to the traffic plan must be coordinated with the local jurisdiction.
Traffic controlForm: (02 )
400703571
1/15/2015
RULE 604.c.S: At the time of construction, all leasehold roads shall be constructed to accommodate local emergency vehicle access requirements, and shall be maintained in a reasonable condition.
General HousekeepingForm: (02 )
400703571
1/15/2015
RULE 604.c.P: All surface trash, debris, scrap or discarded material connected with the operations of the property shall be removed from the premises or disposed of in a legal manner.
ConstructionForm: (02 )
400703571
1/15/2015
RULE 604.c.E: This will be a single well pad.
ConstructionForm: (02 )
400703571
1/15/2015
RULE 604.c.M: Unless otherwise requested by the Surface Owner, well sites constructed within Designated Setback Locations, shall be adequately fenced to restrict access by unauthorized persons.
ConstructionForm: (02 )
400703571
1/15/2015
RULE 604.c.Q: All guy line anchors left buried for future use shall be identified by a marker of bright color not less than four (4) feet in height and not greater than one (1) foot east of the guy line anchor.
ConstructionForm: (02 )
400703571
1/15/2015
RULE 604.c.V: Where possible, operators shall provide for the development of multiple reservoirs by drilling on existing pads or by multiple completions or commingling in existing wellbores (see Rule 322). If any operator asserts it is not possible to comply with, or requests relief from, this requirement, the matter shall be set for hearing by the Commission and relief granted as appropriate. This surface is owned by the operator and serves as the closest to the proposed BHL as possible to get the necessary separation between BHL for the C5 & C5A wells.
Noise mitigationForm: (02 )
400703571
1/15/2015
RULE 604.c.A: Operations involving pipeline or gas facility installation or maintenance, or the use of a drilling rig, are subject to the maximum permissible noise levels for Light Industrial Zones, as measured at the nearest Building Unit. Short-term increases shall be allowable as described in 802.c. Stimulation or re-stimulation operations and Production Facilities are governed by Rule 802.
Noise mitigationForm: (02 )
400703571
1/15/2015
RULE 604.c.A: If determined necessary, lighting abatement measures shall be implemented, including the installation of lighting shield devices on all of the more conspicuous lights, low density sodium lighting where practicable; and rig shrouding is not believed necessary as this is an cropland area and the nearest building unit is over 1,000' away, however, at its election the operator may install temporary engineering controls consisting of perimeter sound walls during drilling and completion activities to provide noise relief. Permanent equipment on location shall be muffled to reduce noise, or shall be appropriately buffered.
Odor mitigationForm: (02 )
400703571
1/15/2015
Per Rule 805: Oil & gas facilities and equipment shall be operated in such a manner that odors and dust do not constitute a nuisance or hazard to public welfare.
Drilling/Completion OperationsForm: (02 )
400703571
1/15/2015
RULE 604.c.B: A Closed Loop Drilling System will be used and no pits.
Drilling/Completion OperationsForm: (02 )
400703571
1/15/2015
RULE 604.c.C: Green Completions – No hydrocarbons anticipated – NA.
Drilling/Completion OperationsForm: (02 )
400703571
1/15/2015
RULE 604.c.H: Blowout prevention equipment for drilling operations in a Designated Setback Location shall consist of (at a minimum): i. Rig with Kelly. Double ram with blind ram and pipe ram; annular preventer or a rotating head. ii. Rig without Kelly. Double ram with blind ram and pipe ram. Mineral Management certification or Director approved training for blowout prevention shall be required for at least one (1) person at the well site during drilling operations.
Drilling/Completion OperationsForm: (02 )
400703571
1/15/2015
RULE 604.c.I: Upon initial rig-up and at least once every thirty (30) days during drilling operations thereafter, pressure testing of the casing string and each component of the blowout prevention equipment including flange connections shall be performed to seventy percent (70%) of working pressure or seventy percent (70%) of the internal yield of casing, whichever is less. Pressure testing shall be conducted and the documented results shall be retained by the operator for inspection by the Director for a period of one (1) year. Activation of the pipe rams for function testing shall be conducted on a daily basis when practicable.
Drilling/Completion OperationsForm: (02 )
400703571
1/15/2015
RULE 604.c.L: Closed chamber drill stem tests shall be allowed. All other drill stem tests shall require approval by the Director. None planned for this well.
Drilling/Completion OperationsForm: (02 )
400703571
1/15/2015
RULE 604.c.N: Any material not in use that might constitute a fire hazard shall be removed a minimum of twenty-five (25) feet from the wellhead, tanks and separator. Any electrical equipment installations inside the bermed area shall comply with API RP 500 classifications and comply with the current national electrical code as adopted by the State of Colorado. An emergency response plan has been generated for this site. No CBL over slotted liner completion.
Drilling/Completion OperationsForm: (02 )
400703571
1/15/2015
RULE 604.c.O: All loadlines shall be bullplugged or capped.
Drilling/Completion OperationsForm: (02 )
400703571
1/15/2015
Well will be logged with an open hole logging tool with gamma ray. A CBL will be run on all production casing or, in the case of a production liner, the intermediate casing, when these casing strings are run.
Drilling/Completion OperationsForm: (02 )
400703571
1/15/2015
Logging – A resistivity log, run from the bottom of the surface casing to total depth of the disposal well or wells or any well within one (1) mile together with a log from that well that can be correlated with the injection well. If the disposal well is to be drilled, a description of the typical stratigraphic level of the disposal formation in the disposal well or wells, and any other available logging or testing data, on the disposal well or wells will be supplied.
Final ReclamationForm: (02 )
400703571
1/15/2015
RULE 604.c.T: Within ninety (90) days after a well is plugged and abandoned, the well site shall be cleared of all non-essential equipment, trash, and debris. For good cause shown, an extension of time may be granted by the Director.
Final ReclamationForm: (02 )
400703571
1/15/2015
RULE 604.c.U: The operator shall identify the location of the wellbore with a permanent monument as specified in Rule 319.a.(5). The operator shall also inscribe or imbed the well number and date of plugging upon the permanent monument.
Underground Injection ControlForm: (02 )
400703571
1/15/2015
Formation Water, Mechanical Integrity, & Step Rate Tests will be done prior to approval to inject.