| General Housekeeping | Form: (02 ) 400700444 12/20/2014 | General housekeeping will consist of neat and orderly storage of materials and fluids. Wastes will be temporarily stored in sealed containers and regularly collected and disposed of at offsite, suitable facilities. If spills occur prompt cleanup is required to minimize any commingling of waste materials with storm water runoff. Routine maintenance will be limited to fueling and lubrication of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or leaks. Any waste product from maintenance will be containerized and transported offsite for disposal or recycling. There will be no major equipment overhauls conducted onsite. Equipment will be transported offsite for major overhauls. Cleanup will consist of patrolling the roadways, access areas, and other work areas to pick up trash, scrap debris, other discarded materials, and any contaminated soil. These materials will be disposed of properly and promptly. |
| Drilling/Completion Operations | Form: (02 ) 400700444 12/20/2014 | Great Western will comply with the “COGCC Policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg Area”, dated May 29, 2012 |
| Drilling/Completion Operations | Form: (02 ) 400700444 12/20/2014 | Prior to drilling operations, Operator will perform an anti-collision scan of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision scan will include definitive MWD or gyro surveys of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed well path with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottom hole location. The proposed well will only be drilled if the anti-collision scan results indicate that there is not a risk for collision, or harm to people or the environment. For the proposed well, upon conclusion of drilling operations, an as-constructed gyro survey will be submitted to COGCC with the Form 5. |
| Drilling/Completion Operations | Form: (02 ) 401657815 11/9/2018 | Kerr-McGee acknowledges and will comply with the COGCC Policy for Bradenhead
Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area
dated May 29, 2012. |
| Drilling/Completion Operations | Form: (02 ) 401657815 11/9/2018 | Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active
(producing, shut in, or temporarily abandoned) offset wellbores that have the potential
of being within one hundred fifty (150) feet of a proposed well prior to drilling
operations for the proposed well. Notice shall be given to all offset operators within
one hundred fifty (150) feet prior to drilling. |
| Drilling/Completion Operations | Form: (02 ) 401657815 11/9/2018 | 317.p Logging Program: One of the first wells drilled on the pad will be logged with
Open Hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface
casing. All wells on the pad will have a cement bond log with gamma-ray run on
production casing (or on intermediate casing if production liner is run) into the surface
casing. The horizontal portion of every well will be logged with a measured-whiledrilling
gamma-ray log. The form 5, Completion Report, for each well on the pad will
list all logs run and have those logs attached. The Form 5 for a well without open-hole
logs shall clearly state "No open-hole logs were run" and shall clearly identify (by API#,
well name & number) the well in which open-hole logs were run. |
| Drilling/Completion Operations | Form: (02 ) 401657815 11/9/2018 | 604c.(2).H. BOPE: Our rigs at a minimum will have a double ram with blind and pipe
ram and annular preventer. |
| Drilling/Completion Operations | Form: (02 ) 401657815 11/9/2018 | 604c.(2).I. BOPE Testing for Drilling Operations: BOPEs will be tested upon rig-up
and, at a minimum, every 30 days. |
| Drilling/Completion Operations | Form: (02 ) 401657815 11/9/2018 | 604c.(2).J. BOPE for Well Servicing Operations: Blowout prevention equipment will be
used on any servicing operations associated with this well. Backup stabbing valves will
be used during any future servicing operations during reverse circulation. Valves shall
be pressure tested before each well servicing operation using low-pressure air and
high-pressure fluid. |
| Drilling/Completion Operations | Form: (02 ) 402363095 11/2/2020 | Kerr-McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012. |
| Drilling/Completion Operations | Form: (02 ) 402363095 11/2/2020 | Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within one hundred fifty (150) feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators within one hundred fifty (150) feet prior to drilling. |
| Drilling/Completion Operations | Form: (02 ) 402363095 11/2/2020 | Alternative Logging Program: One of the first wells drilled on the pad will be logged with open-hole resistivity log and gamma-ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall state “Alternative Logging Program - No open-hole logs were run” and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run. |