| Engineer | Form: (02) 400655414 11/19/2014 | Operator acknowledges the proximity of the listed wells. Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted , and submit a Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Harkis 1 (API 123-10332)
Harkis 3 (API 123-10443)
Harkis 32-2 (API 123-21099)
Harkis 34-2 (API 123-21404) |
| Engineer | Form: (02) 400655414 11/19/2014 | Operator acknowledges the proximity of the listed non-operated wells. Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted, and submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Cannon H 35-14 (API 123-15149) |
| Engineer | Form: (02) 400655414 11/19/2014 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.j and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara and from 200’ below the Sussex to 200’ above Sussex. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well. |
| Engineer | Form: (04) 402301598 05/14/2020 | 2019 Form 17 test data submitted via Bulk Upload. Initial Bradenhead pressure 53 psig, blew down to 0 psig. Revised operator’s comments per email from operator.
2020 Form 17 test data less than COGCC order 1-232 threshold. Pressure < 50 psig, no liquid production.
Deepest water well within one mile = 652'
DWR’s aquifer determination tool base of Laramie-Fox Hills = 677' |
| Engineer | Form: (04) 402481666 09/14/2020 | Operator shall continue to monitor pressure, and report to COGCC through annual test reporting.
|