| Engineer | Form: (02) 400657462 08/08/2014 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (04) 404117131 06/11/2025 | Must conduct a bradenhead test no later than 08/01/2025. The Form 17 must be submitted within 10 days of the bradenhead test date. Email the area inspector and area engineer minimum 10 days prior to conducting the bradenhead test to allow for a witnessed bradenhead test. Submit form 42-Other “Alternative MIT/Bradenhead test” minimum 10 days prior to conducting the bradenhead test. |
| Engineer | Form: (04) 404117131 06/11/2025 | If well is not producing by March 2026 an official MIT will need to be performed and submitted on a Form 21 no later than 04/01/2026. |
| Engineer | Form: (04) 404238743 06/27/2025 | Alternative MIT submitted via Form 4 Sundry Doc #404117131 and demonstrated mechanical integrity. If well is not RTP by March 2026 a Form 21 is required and Rule 434.c will apply if the well has been inactive for 6 months, 12 months of TA. |
| Engineer | Form: (04) 404238743 06/27/2025 | Continue monthly and annual Bradenhead monitoring. |