TypeSource DocumentConditions of Approval
EngineerForm: (02)
400595791
05/07/2014
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (04)
400693975
10/14/2014
1) The flaring of natural gas shall be conducted in accordance with COGCC Rule 912. 2) Notify the local emergency dispatch or the local governmental designee of any natural gas flaring. 3) If flaring will continue more than 6 months, submit updated requests to flare to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. 4) The operator is required to obtain and maintain any required air permits from CDPHE. 5) The venting or flaring volumes shall be reported by Form 7, Operator’s Monthly Report of Operations.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02 )
400595791
7/30/2014
Material handling and spill prevention procedures and practices will be followed to help prohibit discharges to surface waters. Internal storm water inspections will be conducted per applicable stormwater regulations. Any excessive precipitation accumulation within containment should be removed as appropriate and disposed of properly. Implement appropriate erosion control devices where necessary to minimize erosion of the access road and pad.
Material Handling and Spill PreventionForm: (02 )
400595791
7/30/2014
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best practices to contain any unintentional release of fluids.
ConstructionForm: (02 )
400595791
7/30/2014
The location will be fenced and the fenced area will include the fresh water containment. Fresh water for the fresh water storage comes from a water provider, water sources permitted for consumable industrial use.
Drilling/Completion OperationsForm: (02 )
400595791
7/30/2014
Drill cuttings will either be hauled to an approved spread field or waste disposal facility. Drilling fluids will be contained and hauled to an approved waste disposal facility. Flowback and stimulation fluids will be sent to tanks and/or filters to allow the sand to settle out before the fluids are hauled to a state approved disposal facility. Diking, berms, ditches and other forms of containment and diversions will be utilized around tanks, frac tanks, liquids, and/or well pad.
Drilling/Completion OperationsForm: (02 )
400595791
7/30/2014
Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.