Engineer | Form: (02 ) 400550055 5/1/2014 | Operator acknowledges the proximity of the listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
COLLINS 1-1 ( API NO 123-13363),FARR 1 ( API NO 123-11714),
VICTOR C 19-13 ( API NO 123-13508),VICTOR C 19-12 ( API NO 123-13761),
FREEDOM ONE C 19-5 ( API NO 123-14300),FREEDOM TWO C 19-4 ( API NO 123-14624),
STEWART 30-1 ( API NO 123-11797),JOHNSON A-30 ( API NO 123-11961),
STEWART 30-2 ( API NO 123-13302),BROSNAHAN 13-30 ( API NO 123-18990),
OCOMA UPRR C31-13 ( API NO 123-13400),OCOMO C 31-14 ( API NO 123-13401),
OCOMA-UPRR C 31-11 ( API NO 123-13404),OCOMA-UPRR C31-12 ( API NO 123-13405),
HUNTSMAN G 13-16 ( API NO 123-14665),MILLER 24-1 ( API NO 123-14440),
BURKE 24-3 ( API NO 123-14522),API 24-1 ( API NO 123-14684),
CPC PLUSS 25-1 ( API NO 123-12573),PLUSS G 25-8 ( API NO 123-13149),
OCOMA G25-8 ( API NO 123-13149),OCOMA G 25-9 ( API NO 123-13355),
OCOMA G 25-16 ( API NO 123-13356),OCOMA G25-23 ( API NO 123-15626),
GERRITY STATE G 36-01 ( API NO 123-13291),GERRITY STATE G 36-9 ( API NO 123-13292),
GERRITY STATE G 36-08 ( API NO 123-13313),STATE G 36-16 ( API NO 123-13314)
|
Engineer | Form: (02 ) 400550055 5/1/2014 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from the bottom of the production casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
Permit | Form: (02 ) 400550055 5/8/2014 | Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged. |
Permit | Form: (02 ) 400550055 6/6/2014 | Operator must comply with COGCC Policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012. |
OGLA | Form: (06 ) 403999293 12/2/2024 | Operator provided COAs:
3rd party wildlife surveys will be conducted on this well prior to rigging up for P&A activities. Should sensitive HPH conditions be identified during the screening process, Chevron will delay the work until conditions (nesting) clear and/or consult directly with CPW for guidance and discussion of potential mitigation measures that may be incorporated.
Notification will be given to any adjacent building unit occupants within a 1000 feet of the wellhead of planned P&A start date. |
Engineer | Form: (06 ) 403999293 12/10/2024 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l.
2) Prior to placing cement above the base of the Upper Pierre (1580') : verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders.
3) Pump surface casing shoe plug only after isolation has been verified. If surface casing cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 657’ or shallower and provide a minimum of 10 sx plug at the surface.
4) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation.
5) After surface plug and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging recording. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years.
6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed. |
Engineer | Form: (06 ) 403999293 12/10/2024 | Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent.
Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line. |
Engineer | Form: (06 ) 403999293 12/10/2024 | Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. |
Engineer | Form: (06 ) 403999293 12/10/2024 | Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples.
If there is a need for sampling, contact ECMC engineering for verification of plugging procedure. |