Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-39553Heartland State
C31-79-1HN
NOBLE ENERGY INC
100322
PR
8/1/2023
WATTENBERG
90750
WELD  123
SESE 25 4N65W 6
437468View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400550078
5/1/2014
Operator acknowledges the proximity of the listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. COLLINS 1-1 ( API NO 123-13363),FARR 1 ( API NO 123-11714), VICTOR C 19-13 ( API NO 123-13508),VICTOR C 19-12 ( API NO 123-13761), FREEDOM ONE C 19-5 ( API NO 123-14300),FREEDOM TWO C 19-4 ( API NO 123-14624), STEWART 30-1 ( API NO 123-11797),JOHNSON A-30 ( API NO 123-11961), STEWART 30-2 ( API NO 123-13302),BROSNAHAN 13-30 ( API NO 123-18990), OCOMA UPRR C31-13 ( API NO 123-13400),OCOMO C 31-14 ( API NO 123-13401), OCOMA-UPRR C 31-11 ( API NO 123-13404),OCOMA-UPRR C31-12 ( API NO 123-13405), HUNTSMAN G 13-16 ( API NO 123-14665),MILLER 24-1 ( API NO 123-14440), BURKE 24-3 ( API NO 123-14522),API 24-1 ( API NO 123-14684), CPC PLUSS 25-1 ( API NO 123-12573),PLUSS G 25-8 ( API NO 123-13149), OCOMA G25-8 ( API NO 123-13149),OCOMA G 25-9 ( API NO 123-13355), OCOMA G 25-16 ( API NO 123-13356),OCOMA G25-23 ( API NO 123-15626), GERRITY STATE G 36-01 ( API NO 123-13291),GERRITY STATE G 36-9 ( API NO 123-13292), GERRITY STATE G 36-08 ( API NO 123-13313),STATE G 36-16 ( API NO 123-13314)
EngineerForm: (02 )
400550078
5/1/2014
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from the bottom of the production casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
PermitForm: (02 )
400550078
5/8/2014
Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
PermitForm: (02 )
400550078
6/6/2014
Operator must comply with COGCC Policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (02 )
400550078
6/6/2014
Housekeeping will consist of neat and orderly storage of materials and fluids. Wastes will be temporarily stored in sealed containers and regularly collected and disposed of at offsite, suitable facilities. If spills occur prompt cleanup is required to minimize any commingling of waste materials with stormwater runoff. Routine maintenance will be limited to fueling and lubrication of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or leaks. Any waste product from maintenance will be containerized and transported offsite for disposal or recycling. There will be no major equipment overhauls conducted onsite. Equipment will be transported offsite for major overhauls. Cleanup of trash and discarded materials will be conducted at the end of each work day. Cleanup will consist of patrolling the roadway, access areas, and other work areas to pickup trash, scrap debris, other discarded materials, and any contaminated soil. These materials will be disposed of properly.
Storm Water/Erosion ControlForm: (02 )
400550078
6/6/2014
Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with Oil & Gas development throughout the state of Colorado in accordance with Colorado Department of Public Health and Environment (CDPHE) General Permit No. COR-038637. BMP's will be constructed around the perimeter of the site prior to, or at the beginning of construction. BMP's used will vary according to the location, and will remain in place until the pad reaches final reclamation.
Material Handling and Spill PreventionForm: (02 )
400550078
6/6/2014
Spill prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with Oil & Gas operations throughout the state of Colorado in accordance with CFR 112.
Drilling/Completion OperationsForm: (02 )
400550078
6/6/2014
Anti-collision: Prior to drilling operations, Operator will perform an anti-collision scan of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision scan will include definitive MWD or gyro surveys of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed well path with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well will only be drilled if the anti-collision scan results indicate that there is not a risk for collision, or harm to people or the environment. For the proposed well, upon conclusion of drilling operations, an as-constructed gyro survey will be submitted to COGCC with the Form 5.