WELL05-123-39188NRC
30C-32HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
4/1/2025
WATTENBERG
90750
WELD  123
NWNW 8 1N67W 6
330816View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400552908
03/05/2014
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara and from 200’ below the Shannon to 200’ above Sussex. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (02)
400552908
03/05/2014
Operator acknowledges the proximity of the listed non-operated wells. Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted, and submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Rocky Mtn Fuel Co 1-32J (API 123-11337) Rocky Mtn Fuel Co 4-32J (API 123-11338) Glens 42-6 (API 123-09862) Glens 1 (API 123-07448)
EngineerForm: (02)
400552908
03/05/2014
Operator acknowledges the proximity of the listed wells. Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Helen Russel Perrin Gas Unit 1 (API 123-08352)
OGLAForm: (04)
402725086
06/21/2021
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well cleaning operations do not constitute a nuisance or hazard to public health, welfare and the environment.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02 )
400552908
3/30/2014
The nearest building unit is located 2596’ away from this oil and gas location, therefore it is not within a Designated Setback Location and is exempt from 604.c.
Drilling/Completion OperationsForm: (02 )
400552908
3/30/2014
Kerr McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.
Drilling/Completion OperationsForm: (02 )
400552908
3/30/2014
Prior to drilling operations, Operator may perform an anti-collision review of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision review may include MWD or gyro surveys and surface locations of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well may only be drilled if the anti-collision review results indicate that the risk of collision is sufficiently low as defined by the anti-collision plan, with separation factors greater than 1.5, or if the risk of collision has been mitigated through other means including shutting in wells, plugging wells, increased drilling fluid in the event of lost returns or as is appropriate for the specific situation. In the event of an increased risk of collision, that risk will be mitigated to prevent harm to people, the environment or property. For the proposed well, upon conclusion of drilling operations, an as-constructed directional survey will be submitted to COGCC with the Form 5. Please see the attached 318A.m letter for a list of well(s) identified by the operator as being within 150 feet of the proposed well(s). If no letter is attached, the operator has not identified any wells as being within 150 feet of the proposed well(s) at the time of permitting.
PlanningForm: (04 )
402725086
6/21/2021
Site lighting shall be shielded and directed downward and inward toward operations to avoid glare on public roads and nearby Building Units.
Dust controlForm: (04 )
402725086
6/21/2021
Water will be placed on dirt access roads to mitigate dust as needed.
Noise mitigationForm: (04 )
402725086
6/21/2021
Noise associated with pipe handling, traffic, and other operational activity will be minimized between 7:00 pm and 7:00 am. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units and continuous monitoring will be placed at the appropriate noise points of compliance pursuant to Rule 423.a.(5).
Odor mitigationForm: (04 )
402725086
6/21/2021
Closed, upright tanks are being utilized to mitigate odor.
Odor mitigationForm: (04 )
402945377
5/11/2022
Odor: Closed, upright tanks are being utilized to mitigate odor.
Community Outreach and NotificationForm: (04 )
402945377
5/11/2022
Community notifications: Courtesy notifications will be sent to all parcel owners with building units within 1,500 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources. Signs: Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard
General HousekeepingForm: (04 )
402945377
5/11/2022
Lighting: Operations are daylight-only; no lighting impacts are anticipated from operations.
Noise mitigationForm: (04 )
402945377
5/11/2022
Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units.
General HousekeepingForm: (04 )
402945377
5/11/2022
Dust: Water will be placed on dirt access roads to mitigate dust as needed.