| Permit | Form: (02) 400521605 01/22/2014 | Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged. |
| Engineer | Form: (02) 400521605 01/22/2014 | Operator acknowledges the proximity of the Becker 5-1 (API NO 123-12297), and the Becker 5-6 (API NO 123-13763). Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. |
| Engineer | Form: (02) 400521605 01/22/2014 | Operator acknowledges the proximity of the non-operated wells: The Marie D 4-4 (API NO 123-13111), the Marie D 4-12 (API NO 123-13182), the Marie D 4-5 (API NO 123-15121), the Marie D 4-13 (API NO 123-15142), the PTF C 32-16 (API NO 123-14880), the Pluss 32-43 (API NO 123-15974), and the Lindsay C33-13 (API NO 123-14712) wells. Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted, and submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. |
| Engineer | Form: (02) 400521605 01/22/2014 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from the bottom of the production casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|