| Permit | Form: (02) 400521607 01/22/2014 | Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged. |
| Engineer | Form: (02) 400521607 01/23/2014 | Operator acknowledges the proximity of the Becker 5-1 (API NO 123-12297), the Becker 5-2 (API NO 123-13742) and the Becker 5-6 (API NO 123-13763). Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. |
| Engineer | Form: (02) 400521607 01/23/2014 | Operator acknowledges the proximity of the non-operated wells: The PTF C 32-16 (API NO 123-14880), the McGuirk-Howell C 32-14 (API NO 123-15882), and the Pluss 32-43 (API NO 123-15974) wells. Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted, and submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
|
| Engineer | Form: (02) 400521607 01/23/2014 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from the bottom of the production casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (04) 400651086 08/22/2014 | Operator acknowledges the proximity of the listed wells. Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted , and submit a Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Becker 5-5 API 123-13838
Becker 5-16 API 123-18181 |
| Engineer | Form: (04) 400651086 08/22/2014 | Operator acknowledges the proximity of the listed non-operated wells. Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted, and submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Pluss 32-43 API 123-15974 |
| Engineer | Form: (04) 400651086 08/22/2014 | Operator acknowledges the proximity of the listed non-operated wells. Operator agrees to provide mitigation Option 4 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted, and submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Use of Option 4 is contingent upon completion of successful Bradenhead test and submission of form 17 that shows the well is in compliance with the COGCC "Policy for Special Bradenhead Testing Area in Weld County" dated 12/16/2009. Option 4 remediation will include pulling tubing, installing at least 2 RBPs, pressure test of casing, installing a 5K wellhead, and onsite monitoring of the Bradenhead during hydraulic stimulation of offset wells within a 1500' radius.
PTF C32-16 API 123-14880
McGuirk-Howell C 32-14 API 123-15882
Ruby Red D 8-2 API 123-16885 |
| Engineer | Form: (04) 400651086 08/22/2014 | Operator acknowledges the proximity of the listed wells. Operator agrees to provide mitigation Option 4 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted , and submit a Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Use of Option 4 is contingent upon completion of successful Bradenhead test and submission of form 17 that shows the well is in compliance with the COGCC "Policy for Special Bradenhead Testing Area in Weld County" dated 12/16/2009. Option 4 remediation will include pulling tubing, installing at least 2 RBPs, pressure test of casing, installing a 5K wellhead, and onsite monitoring of the Bradenhead during hydraulic stimulation of offset wells within a 1500' radius.
Becker 5-1 API 123-12297
Becker 5-2 API 123-13742
Becker 5-6 API 123-13763
Becker 5-10 API 123-16974
Becker 5-3 API 123-17299
Becker 5-11 API 123-17300
Becker 5-12 API 123-17301
Becker 5-13 API 123-17302
Becker 5-4 API 123-18179
Becker 5-15 API 123-18182
Becker 6 API 123-22594 |
| Engineer | Form: (04) 400651086 08/22/2014 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara and from 200’ below the Sussex to 200’ above Sussex. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well. |
| Engineer | Form: (04) 400669500 08/27/2014 | Exception granted contingent upon submission of available logs currently not on file with COGCC for nearby operated well Becker 5-6 (API 123-13763) by September 30th, 2014. Form 5 lists logs run as: GR-CCL-NL-CBL. |